DataCenterPUELab

A2 airside setpoint sensitivity

An A2 equipment room is screened at a 29 °C inlet setpoint using a 4 K approach and a 7 K partial band.

Engineering schematic

Annual climate-bin dispatch

Live
Annual climate-bin dispatch FREE HOURS 5,300 h. ENERGY SAVE 1,726.3 MWh. COST SAVE 207k $. CO₂E AVOID 604.2 t CO₂e. See the results table for the full readout. FREE HOURS5,300hENERGY SAVE1,726.3MWhCOST SAVE207k$CO₂E AVOID604.2t CO₂e 800-3°1,2005°1,50010°1,80015°1,70027°1,76034°Full-freePartialMechanical°CEquivalent full-free cooling / year0%74% freeLimit 100%

Inlet setpoint falls within the A2 allowable range and outside the recommended range.

Inputs

Operating limits
°C
K
K
Load and utility rates
kWₜₕ
kW/kWₜₕ
kW/kWₜₕ
$/kWh
g/kWh
Annual climate bins

Enter six representative outdoor temperatures and annual hours. Any unentered hours, including lockouts, use mechanical cooling.

BinDry-bulbAnnual hours1
°C
h
2
°C
h
3
°C
h
4
°C
h
5
°C
h
6
°C
h

Calculation details

MeasureValue
Full-free outdoor cutoff25 °C
Mechanical cooling threshold32 °C
Full-free cooling hours5,300 h
Partial cooling hours1,700 h
Mechanical cooling hours1,760 h
Unentered hours assigned to mechanical0 h
Equivalent full-free cooling hours6,514.29 h
All-mechanical baseline energy2,847 MWh
Energy in full-free bins318 MWh
Energy in partial bins230.71 MWh
Energy in mechanical bins572 MWh
Modeled annual cooling energy1,120.71 MWh
Annual cooling energy savings1,726.29 MWh
Baseline cooling energy saved60.64 %
Annual energy cost savings207,154 $
Annual grid emissions avoided604.2 t CO₂e

Starting calculation

  1. Subtract 4 K of approach to get a 25 °C full-free cutoff. The entered bins give 5,300 full-free and 1,700 partial hours.
  2. Weight plant power by each bin. Annual cooling energy moves from 2,847 MWh to 1,120.71 MWh.

Compare the result with a 27 °C setpoint and review site equipment and environmental limits before applying the warmer case.

Calculation method

  • Full-free cutoff = applicable setpoint − total approach
  • Partial-free fraction = (full-free cutoff + band − bin temperature) ÷ band
  • Annual MWh = Σ(cooling kW × mode input ratio × hours) ÷ 1,000

Airside uses outdoor dry-bulb against the IT inlet setpoint. Waterside uses outdoor wet-bulb against chilled-water supply. Partial cooling linearly blends both plant intensities. Missing climate hours are assigned to mechanical cooling in an 8,760-hour year.

Engineering limits

ASHRAE A1/A2 recommended inlet temperature spans 18–27 °C. At reference elevation, dry-bulb allowable limits are 15–32 °C for A1 and 10–35 °C for A2. Apply equipment, humidity, contamination and elevation limits when screening outdoor hours. Include relevant fans and pumps in both plant intensities.

Related worked examples