The calculators use steady-state facility balances and simplified equipment models for early sizing, commissioning checks and scenario comparison.

Inputs, rounding & assumptions

Each worked example opens with illustrative operating data that you can edit. Calculations retain full precision. Displayed readings round for readability, and the SI and US views preserve the same physical input values.

US airflow uses cubic feet per minute, liquid flow uses US gallons per minute, and cooling uses refrigeration tons where applicable. Power for electrical equipment uses kW in both views. Annual energy results use a common meter boundary and explicit operating hours.

Treat the estimates as a starting point. Confirm local codes, equipment ratings, operating envelopes and measured site conditions before making facility decisions.

PUE, DCiE, WUE & CUE

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.

Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.

Direct-to-chip CDU flow

The balance uses the supply-to-return temperature rise across the rack loop. Screening properties near room temperature are 4.18 kJ/(kg·K) and 997 kg/m³ for water, and 3.90 kJ/(kg·K) and 1,022 kg/m³ for an approximate 25% propylene glycol mix.

Confirm coolant properties at the mean loop temperature using your fluid supplier’s data. Use the CDU and cold-plate pressure-drop curves to determine the actual operating point and confirm minimum flow, material compatibility and temperature limits.

CRAC / CRAH airflow

Use sea-level reference density of 1.20 kg/m³, adjusted by standard atmospheric pressure ratio at the entered elevation, with fixed specific heat. Rated sensible coil capacity is nameplate total capacity times SHR.

The recirculation factor is a delivery estimate. Use measured inlet and return conditions, fan curves and site air balancing for equipment selection. A very high calculated ΔT calls for review of the assumed load and airflow.

Raised-floor tile airflow

The orifice equation estimates gross flow. Apply the entered delivery fraction for useful rack airflow, then round the required tile count up. Zero pressure gives zero flow and no finite tile count.

Use the local plenum-to-aisle pressure. Grate geometry, cable congestion and leakage can change the discharge coefficient and pressure distribution. Verify results against the manufacturer’s tile curve and measured air balance.

Tier redundancy & IT capacity

Dual paths are equal in size and either path can carry the modeled load. The path-isolated ceiling keeps the specified module reserve on the surviving path. Usable capacity is split into assigned load and idle headroom. Stranded kW is the amount withheld by the design cap.

A single-path design has zero capacity through an isolated path. Module redundancy alone cannot establish a Tier classification. Concurrent maintainability also depends on the physical distribution, isolation, component arrangements and maintenance procedures.

Three-phase rack PDU balance

Use nominal line-to-neutral voltage and phase-to-neutral real kW. Imbalance is largest deviation from the phase mean divided by that mean. Transferable loads from the failed whip are added to corresponding phases on the survivor. Non-transferable single-cord loads on the failed whip drop.

The neutral model uses fundamental currents with a common power factor and 120° phase spacing. Check harmonic neutral current, conductor ampacity, breaker listing and local code separately. The screen uses 80% of a standard-rated breaker for a continuous load of three hours or more.

UPS battery runtime

The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.

Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.

Free-cooling economizer

Airside uses outdoor dry-bulb against the IT inlet setpoint. Waterside uses outdoor wet-bulb against chilled-water supply. Partial cooling linearly blends both plant intensities. Missing climate hours are assigned to mechanical cooling in an 8,760-hour year.

ASHRAE A1/A2 recommended inlet temperature spans 18–27 °C. At reference elevation, dry-bulb allowable limits are 15–32 °C for A1 and 10–35 °C for A2. Apply equipment, humidity, contamination and elevation limits when screening outdoor hours. Include relevant fans and pumps in both plant intensities.