The six bins represent only 6,000 screened hours. The remaining annual hours require mechanical cooling.

Engineering schematic

Annual climate-bin dispatch

Live
Annual climate-bin dispatch FREE HOURS 3,600 h. ENERGY SAVE 1,119.6 MWh. COST SAVE 134k $. CO₂E AVOID 391.9 t CO₂e. See the results table for the full readout. FREE HOURS3,600hENERGY SAVE1,119.6MWhCOST SAVE134k$CO₂E AVOID391.9t CO₂e 450-8°6503°1,00010°1,50017°1,25022°1,15029°2,760OtherFull-freePartialMechanical°CEquivalent full-free cooling / year0%48% freeLimit 100%

4,225 h of equivalent full-free cooling per year.

Inputs

Operating limits
°C
K
K
Load and utility rates
kWₜₕ
kW/kWₜₕ
kW/kWₜₕ
$/kWh
g/kWh
Annual climate bins

Enter six representative outdoor temperatures and annual hours. Any unentered hours, including lockouts, use mechanical cooling.

BinDry-bulbAnnual hours1
°C
h
2
°C
h
3
°C
h
4
°C
h
5
°C
h
6
°C
h

Calculation details

MeasureValue
Full-free outdoor cutoff19 °C
Mechanical cooling threshold25 °C
Full-free cooling hours3,600 h
Partial cooling hours1,250 h
Mechanical cooling hours3,910 h
Unentered hours assigned to mechanical2,760 h
Equivalent full-free cooling hours4,225 h
All-mechanical baseline energy2,847 MWh
Energy in full-free bins216 MWh
Energy in partial bins240.62 MWh
Energy in mechanical bins1,270.75 MWh
Modeled annual cooling energy1,727.38 MWh
Annual cooling energy savings1,119.63 MWh
Baseline cooling energy saved39.33 %
Annual energy cost savings134,355 $
Annual grid emissions avoided391.87 t CO₂e

Starting calculation

  1. Subtract 4 K of approach to get a 19 °C full-free cutoff. The entered bins give 3,600 full-free and 1,250 partial hours.
  2. Weight plant power by each bin. Annual cooling energy moves from 2,847 MWh to 1,727.38 MWh.

The unentered hours stay mechanical even when the entered air temperatures would otherwise allow economization.

Calculation method

  • Full-free cutoff = applicable setpoint − total approach
  • Partial-free fraction = (full-free cutoff + band − bin temperature) ÷ band
  • Annual MWh = Σ(cooling kW × mode input ratio × hours) ÷ 1,000

Airside uses outdoor dry-bulb against the IT inlet setpoint. Waterside uses outdoor wet-bulb against chilled-water supply. Partial cooling linearly blends both plant intensities. Missing climate hours are assigned to mechanical cooling in an 8,760-hour year.

Engineering limits

ASHRAE A1/A2 recommended inlet temperature spans 18–27 °C. At reference elevation, dry-bulb allowable limits are 15–32 °C for A1 and 10–35 °C for A2. Apply equipment, humidity, contamination and elevation limits when screening outdoor hours. Include relevant fans and pumps in both plant intensities.