PUE, DCiE, WUE & CUE
Compare facility and IT energy, account for cooling, UPS and lighting overhead, and price a lower PUE target.
Critical facilities · Mechanical & electrical
Size power and cooling, check rack-level limits, and estimate annual energy, water and carbon performance.
Live engineering checks with editable inputs.
Compare facility and IT energy, account for cooling, UPS and lighting overhead, and price a lower PUE target.
Size secondary coolant flow, temperature rise and residual air cooling for high-density GPU racks, including 40–150 kW/rack designs.
Calculate supply CFM or rack temperature rise using sensible load, elevation, coil SHR and hot/cold aisle air losses.
Estimate CFM per floor tile, tile count and supported rack kW from open area and plenum static pressure.
Compare N, N+1, 2N and 2(N+1) for protected IT capacity, maintenance headroom, stranded power and cost per usable kW.
Check A/B whip phase currents, Wye neutral load and failover headroom on 415/240 V or 208/120 V service.
Estimate lead-acid string count, end-of-discharge runtime, UPS heat and time to recover 90% of discharged amp-hours.
Model free, partial and mechanical cooling hours and their annual MWh, energy cost and grid emissions.
Open a starting case and change its inputs.