Worked example · Line balance
Pump line with tied bottlenecks
Study a pump line where press fitting and pressure testing each take 92 seconds against 90-second customer takt.
Takt = Net available time ÷ Demand
Baseline reading
Two stations share the constraint. Improving only the first leaves the second at 92 seconds and keeps steady-state output at 293.
What to test
Test two modest reductions together, then check whether each proposed task transfer fits its receiving station with the same equipment and qualifications.
Worksheet inputs
Inputs
Results
- Takt time
- 90 sec
- Bottleneck station
- Station 1, 2
- Bottleneck cycle
- 92 sec
- Maximum steady-state shift output
- 293
- Output minus demand
- -7
- Net available shift time
- 27,000 sec
- Total work content
- 332 sec
- Theoretical station equivalents
- 3.68889
- Minimum whole stations
- 4
- Line balance efficiency
- 90.2174%
- Balance delay
- 9.7826%
Model notes
Use station times for one unit, with the same product and work method. Maximum output assumes a staffed, paced line in steady state and excludes start-up fill and starvation.
The minimum whole-station count is a workload bound. Precedence, indivisible tasks, tooling and travel can require more operators or stations.
Frequently asked questions
Why list two bottleneck stations for this pump line?
Both have the same cycle time. Either one can set the departure interval for the paced line if the other improves.
Can assembly work overlap pressure-test dwell?
Only count overlap that the process permits while the operator and fixture remain available. Confirm interlocks and test procedure before treating dwell as free time.