Takt Time, Yamazumi & Line Staffing Calculator
Find takt time, the bottleneck, steady-state line output, minimum staffing, Yamazumi balance efficiency, and balance delay for up to six workstations.
Takt = Net available time ÷ Demand
Worksheet inputs
Inputs
Results
- Takt time
- 66 sec
- Bottleneck station
- Station 3
- Bottleneck cycle
- 74 sec
- Maximum steady-state shift output
- 356
- Output minus demand
- -44
- Net available shift time
- 26,400 sec
- Total work content
- 233 sec
- Theoretical station equivalents
- 3.5303
- Minimum whole stations
- 4
- Line balance efficiency
- 78.7162%
- Balance delay
- 21.2838%
Model notes
Use station times for one unit, with the same product and work method. Maximum output assumes a staffed, paced line in steady state and excludes start-up fill and starvation.
The minimum whole-station count is a workload bound. Precedence, indivisible tasks, tooling and travel can require more operators or stations.
Frequently asked questions
Why can a highly balanced line still miss takt?
Balance efficiency measures how evenly work fills the current bottleneck cycle. Every station can be equally busy while all stations run more slowly than customer takt.
Does the station-equivalent number specify how many people to schedule?
It gives a theoretical lower bound after rounding up. Check whether work can move between stations and budget staffing for relief, replenishment, and tasks that require a specific skill.
How should I enter a workstation with two identical parallel machines?
Use the effective time between finished units from that combined station under the intended staffing and uptime. Verify the pair can actually run at that cadence.