Worked example · Line balance

Feeder cell staffing from work content

Use 193 seconds of observed work content to bound staffing for a three-station feeder assembly cell.

Takt = Net available time ÷ Demand

Baseline reading

Work content is 2.14 station equivalents at the 90-second pace. Three whole stations are needed even before precedence and walk time are considered.

What to test

List subtasks within each station cycle. Use the underlying task durations to evaluate staffing changes and a practical station layout.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Shift and demand
sec
sec
Observed workstation cycles
sec
sec
sec
sec
sec
sec

Results

Takt time
90 sec
Bottleneck station
Station 1
Bottleneck cycle
73 sec

Every entered station is at or below customer takt.

Yamazumi station balance
Yamazumi station balance Station cycle bars with the dashed takt threshold. Ochre identifies stations above takt. CUSTOMER TAKT 90 sec025.250.475.6100.8Station 173Station 262Station 358sec
Maximum steady-state shift output
271
Output minus demand
51
Net available shift time
19,800 sec
Total work content
193 sec
Theoretical station equivalents
2.14444
Minimum whole stations
3
Line balance efficiency
88.1279%
Balance delay
11.8721%

Model notes

Use station times for one unit, with the same product and work method. Maximum output assumes a staffed, paced line in steady state and excludes start-up fill and starvation.

The minimum whole-station count is a workload bound. Precedence, indivisible tasks, tooling and travel can require more operators or stations.

View the equations

Frequently asked questions

Could two feeder operators meet takt by working faster?

At the entered standard, 193 seconds of work exceeds the combined 180 seconds available per takt for two operators. Document a verified work-content reduction first.

How should a shared feeder replenisher be counted in staffing?

Add per-unit work done by the line operators to station cycles. Track dedicated replenisher staffing separately as an external resource to the cell.