Calculate overall equipment effectiveness, TEEP, availability, performance, quality, and lost good units from downtime, slow cycles, and rejects.

OEE = Availability × Performance × Quality

Currency labels entered amounts. Exports record the selected display units.

Inputs

Production window
min
min
min
min

Include all hours in the same period. Use 24 hours for one calendar day.

Production counts
min
Loss detail
min

Use the stop threshold in your plant reporting policy.

Results

Overall equipment effectiveness
77.3333%
Total effective equipment performance
24.1667%
Availability
88.8889%
Good-unit waterfall and APQ factors
Good-unit waterfall and APQ factors Waterfall from ideal production to first-pass good parts, followed by availability, performance, and quality factor bars. IDEAL GOOD-UNIT EQUIVALENTS900Ideal100Stops80Speed24Rejects696GoodAvailability88.9%Performance90%Quality96.7%
Performance
90%
Quality
96.6667%
Calendar utilization
31.25%
Run time
400 min
First-pass good parts
696
Ideal planned output
900 units
Lost to downtime
100 units
Lost to slow cycles and minor stops
80 units
Lost to scrap or rework
24 units
Unplanned stop loss
80 units
Setup and adjustment loss
20 units
Minor-stop loss
16 units
Reduced-speed loss
64 units
Production rejects
16
Startup rejects
8

Model notes

Count each first-pass reject once. Use the ideal rate for the product being run and reconcile shift counts against the same production window.

The waterfall translates time losses into good-unit equivalents. Once stops and speed losses are removed, each rejected part reduces first-pass good output by one unit.

View the equations

Frequently asked questions

Which denominator separates OEE from TEEP?

OEE uses scheduled production time. TEEP divides the ideal time represented by good parts by the full calendar time, including unscheduled nights and weekends.

Where should a five-minute changeover go in OEE?

If the machine was scheduled to produce, record the changeover as setup and adjustment downtime. Time outside the production schedule belongs in the calendar utilization gap.

What should I investigate when performance would exceed 100%?

Reconcile the ideal cycle time, counter multipliers, and the time window. Parallel cavities or an incorrect downtime total can make the measured output appear faster than the nominated ideal rate.