Machine Hourly Rate, Setup Amortization & Batch Quote Calculator

Build a CNC or machine-shop hourly rate from depreciation, burden, labor and utilization. Quote a batch and compare unit cost at four quantities.

Hourly rate = Annual burden ÷ Billable hours + Allocated labor

Currency labels entered amounts. Exports record the selected display units.

Inputs

Machine and billable capacity
$
yr
hr/yr
%
Annual burden and direct labor
$/yr
$/yr
$/yr
$/yr
$/hr
Batch quote
min
min
$
%
%

Results

All-in machine hourly rate
$43.94/hr
Total unit cost
$5.93
Quoted price per unit
$7.11
Batch quantity versus unit cost
Batch quantity versus unit cost Unit cost declines as the fixed setup is spread across more saleable units. The current batch is marked in ochre. UNIT COST / QUANTITY ON LOG SCALE$4.7$7.5$10.4$13.210502501KCurrent 250 pcs • $5.9/pc
Unit cost by batch
10 units$12.26
50 units$6.98
250 units$5.93
1,000 units$5.73
Total batch quote
$1,778.67
Setup amortized per unit
$0.26
Run cost per saleable unit
$0.97
Material per saleable unit
$4.69
Setup cost per batch
$65.91
Billable hours per year
2,800 hr
Equipment burden rate
$15.94/hr
Allocated operator rate
$28.00/hr

Model notes

The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.

Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.

View the equations

Frequently asked questions

Where should shared labor go when one operator tends several CNCs?

Divide the hourly burdened operator rate by the effective machines per operator for the job. Use a concurrency ratio that reflects attendance for setup, inspection, and handling.

Why does the quote rise when annual available hours stay flat?

Reduced billable utilization spreads depreciation and annual burden over fewer hours. The calculated allocated labor rate stays tied to the staffing ratio.

Does the quote markup field create the same percentage as gross margin?

For unit cost of 100 and markup of 20%, price is 120 and margin is 20 ÷ 120, or 16.67%. Enter markup on cost in this worksheet.