NFPA 20 · Worked example

Flowing suction below the project floor

A 1,250 GPM pump meets the head-envelope points, but effective suction during the governing test drops to 3 psi against a 10 psi floor.

Inputs

Measured net pump points
GPM
psi
psi
psi
psi
psi

Evaluate suction at the governing pump flow.

Driver and pressure maintenance
%
%
hp

Use 0 when the full-curve maximum is unavailable.

%
GPM
GPM
psi

Three-point fire pump curve

Worksheet units
Edit inputs
Three-point fire pump curve · Input-linked engineering diagramCHURN HEAD123%150% HEAD70%DRIVER LOAD135hpSUCTION MARGIN-7psiHead · % of ratedTest pointsNFPA limits01002000100150Flow · % of ratedSmaller pump-curve reserve+5 pp−25 pp0 pp limit+25 pp
Suction below project floor

Measured flowing suction is below the entered minimum at the evaluated flow.

How to read this example

Report the suction pressure margin separately from the pump curve. Evaluate supply losses and available suction under the same flow condition.

Open the base calculator

Calculated values

Churn · percent of rated pressure
123 %
150% flow · percent of rated pressure
70 %
150% test flow
1,875 GPM
Reserve below 140% ceiling
17 pp
Reserve above 65% floor
5 pp
Flowing suction reserve
-7 psi
Rated water power
72.93 hp
150% water power
76.58 hp
Rated shaft load
101.29 hp
150% shaft load
114.29 hp
Electric mechanical power estimate
135 hp
Diesel pre-derating power estimate
150 hp
Pressure maintenance flow estimate
1.8 GPM
Jockey discharge target
161 psi

Equations and assumptions

  • Churn ≤ 140% of rated net pressure
  • P_150 ≥ 65% of rated net pressure
  • Water hp = Q ΔP / 1714
  • BHP = water hp / pump efficiency

Enter net pump pressures at churn, rated flow and 150% flow. Use the listed full-curve peak BHP and the manufacturer’s site derating and driver data for selection.

The suction field screens a measured gauge pressure against the entered minimum. Confirm the adopted standard, the supply type, its available flow, intake arrangement and pump suction limits.

The jockey estimate uses at least 1 GPM or the entered leakage rate and aims for churn net pressure plus static suction. Compare with one sprinkler flow for aboveground-only pressure maintenance.

Source references