NFPA 13 / 22

Fire water tank sizing and duration

Combine sprinkler and hose demand, then size the usable drawdown and cylindrical tank shell.

Inputs

Tank-fed demand
GPM
Proposed tank shell
ft
ft
%

Water below the effective low-water level.

%

Volume above the maximum operating water level.

Suction tank section

Worksheet units
Edit inputs
Suction tank section · Input-linked engineering diagramTANK DEMAND750GPMUSABLE TARGET45,000galGROSS TARGET50,561.8galRUN TIME60.74minFREEBOARD · 4%USABLE DRAWDOWN45,554.31 galLOW-WATER LEVELDead water 7%Ø 22 ftShell 18 ftAvailable vs. required duration+0.74 min0 min60 min target120 min
Water duration target met

Usable storage above the low-water limit covers the entered demand and duration.

Calculated values

Outside hose portion
200 GPM
Hose demand on this tank
250 GPM
Total tank-fed demand
750 GPM
Minimum usable storage
45,000 gal
Minimum gross shell volume
50,561.8 gal
Entered gross shell volume
51,184.62 gal
Entered usable drawdown
45,554.31 gal
Supply duration
60.74 min
Duration reserve
0.74 min
Required height at entered diameter
17.78 ft
Required diameter at entered height
21.87 ft

Equations and assumptions

  • V_usable, required = (Q_sprinkler + Q_hose,tank) × t
  • V_gross = V_usable / (1 − dead fraction − freeboard fraction)
  • V_cylinder = π D² H / 4

Select the allowance and duration required by the adopted sprinkler design basis. Count outside hose demand on this tank unless a separate supply can deliver that portion.

Gross volume is the straight cylindrical shell. Usable storage lies between the maximum operating level and the effective low-water level above the suction intake or vortex assembly.