Worked example
Sand pile with capped effective stress
A critical-depth assumption limits the stress used below 14 m in a homogeneous sand screening model.
Results
Edit inputs ↓- Allowable
- 781.5 kN
- Ultimate
- 1,953.7 kN
- Shaft
- 1,112.6 kN
- Tip
- 841.2 kN
- Shaft friction
- Tip bearing
- Embedment
Service compression is within the static allowable load.
Calculation details
| Allowable minus service load | 561.5 kN |
|---|---|
| Tip area | 0.196 m² |
| Shaft perimeter | 1.571 m |
| Mean unit shaft resistance | 30.8 kPa |
| Unit tip resistance | 4,284 kPa |
| Effective vertical stress at tip | 142.8 kPa |
| Shaft share of static capacity | 56.9 % |
| Driving estimate basis | Off |
| End-of-drive screening load | — |
GeotechSoilLab · Screening sheet · Metric SI
Sand pile with capped effective stress
| Installation | Driven pile |
|---|---|
| Section shape | Round |
| Diameter or width | 0.5 m |
| Embedment L | 23 m |
| Static safety factor | 2.5 |
| Service axial load | 220 kN |
| Soil model | Sand (β) |
| Shaft factor β | 0.31 |
| Effective weight γ′ | 10.2 kN/m³ |
| Tip factor Nq* | 30 |
| Critical depth | 14 m |
| Driving method | None |
| Allowable | 781.5 kN |
|---|---|
| Ultimate | 1,953.7 kN |
| Shaft | 1,112.6 kN |
| Tip | 841.2 kN |
| Allowable minus service load | 561.5 kN |
| Tip area | 0.196 m² |
| Shaft perimeter | 1.571 m |
| Mean unit shaft resistance | 30.8 kPa |
| Unit tip resistance | 4,284 kPa |
| Effective vertical stress at tip | 142.8 kPa |
| Shaft share of static capacity | 56.9 % |
| Driving estimate basis | Off |
| End-of-drive screening load | — |
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Worked result
Integrate the rising friction above the cap and constant friction below it. Tip stress also uses the cap.
- A mean shaft stress of 30.795 kPa gives Qs = 1,112.576 kN. Tip stress times 0.196 m² gives Qp = 841.161 kN.
- Add Qs and Qp to get 1,953.738 kN. Divide by 2.5 for a static allowable load of 781.495 kN.
Allowable781.5 kNUltimate1,953.7 kNShaft1,112.6 kNTip841.2 kN
Original case inputs
| Installation | Driven pile |
|---|---|
| Section shape | Round |
| Diameter or width | 0.5 m |
| Embedment L | 23 m |
| Static safety factor | 2.5 |
| Service axial load | 220 kN |
| Soil model | Sand (β) |
| Shaft factor β | 0.31 |
| Effective weight γ′ | 10.2 kN/m³ |
| Tip factor Nq* | 30 |
| Critical depth | 14 m |
| Driving method | None |
Method & assumptions
- Clay uses unit shaft adhesion αsu and tip resistance 9su. Sand uses unit friction βσ′v and tip resistance Nq*σ′v. Shaft friction is integrated along the embedment and multiplied by section perimeter.
- The homogeneous sand model uses the effective unit weight to compute σ′v. A nonzero critical depth caps stress in both the shaft integral and tip term. The static allowable load is (Qs + Qp) / F.S.
- ENR divides input energy by the sum of set and empirical displacement, then by 6. The displacement is 0.1 in for a single-acting hammer and 1 in for a drop hammer.
- FHWA Modified Gates uses 1.75√E log₁₀(10N) − 100 kips with developed hammer energy E in ft·lbf and N in blows per inch. The coefficient includes the stated 80% efficiency convention. A nonpositive estimate is unavailable.
- The driving formulas apply to driven piles at end of drive. Select site-calibrated parameters for the installation method and verify load transfer, settlement and capacity with appropriate field testing.
More worked examples
- Driven circular pile in clayA driven circular pile extends through a uniform undrained clay profile.
- Driven square pile in sandA square pile extends through saturated uniform sand with no critical-depth cap.
- Drilled shaft in cohesive soilA circular drilled shaft is screened using an installation-specific adhesion factor in clay.
- Drilled shaft in sandA drilled shaft bears in sand. The preliminary β and tip factors reflect the chosen construction method.
- ENR end-of-drive screeningA single-acting hammer records a set of 4.8 mm per blow at the end of driving.
- Modified Gates end-of-drive screeningA developed hammer energy and end-of-drive set are recorded for a driven steel pile.