Worked example · IEC 60364 · NEC 250 context

gG fuse with specified curve point

TN-S and TN-C-S loop impedance, protection threshold and adiabatic CPC area.

The fuse manufacturer’s total-clearing curve is assumed to give a 190 A threshold at the entered time. The number is an illustrative curve input.

Device threshold met

Compared with the curve current for the selected protective device.

Fault loop impedance
0.896 Ω
Earth-fault current
243.86 A
Maximum permissible Zₛ
1.15 Ω
CPC area at modeled current
1.3411 mm²

Inputs

Circuit return path
V
×
Ω
Ω
Ω
×
Protection and CPC
A
Use the manufacturer’s total-clearing curve at the entered time.
s
A√s/mm²
Use the value for the material, insulation and starting temperature.

Phase-to-PE fault loop

Live schematic
Loop Zs0.896 ΩFault current243.9 AZs limit1.15 ΩCPC area1.341 mm²TN-S · METALLIC LOOPR₁ phase 0.288 ΩR₂ protective 0.348 ΩEarthed sourceFaulted loadZₑ 0.26 ΩPROTECTIVE DEVICE CHECKProspective earth-fault current243.9 ADevice threshold190 ALoop impedance headroom0.254 ΩLoop impedance / limit77.91%
The fault returns on PE and, in TN-C-S, through the upstream PEN. The parallel earth paths are omitted.

Derived values & comparisons
Protective device threshold190 A
Zₛ headroom0.254 Ω
Fault current above threshold53.862 A
Warm phase / CPC resistance0.288 Ω / 0.348 Ω
Next size for modeled fault duty1.5 mm²
Supply voltage after cₘᵢₙ218.5 V

Screening scope. Verify actual loop impedance, the manufacturer’s clearing curve and device breaking capacity. Size the CPC for worst-case let-through I²t and the applicable minimum area. NEC 250 uses separate bonding and equipment grounding provisions.

Try this. Change the curve current and corresponding time as a pair, then compare both the Zₛ limit and adiabatic area.

Calculation method

IEC 60364-4-41 and IEC 60364-5-54. Zₛ = Zₑ + (R₁ + R₂) × temperature factor, with the floor current Iₑꜰ = U₀cₘᵢₙ/Zₛ and limit Zₛ,ₘₐₓ = U₀cₘᵢₙ/Iₐ. Resistances are added as a scalar screening approximation.

The B, C and D defaults use 5, 10 and 20 times In, respectively. For a gG fuse, enter the total-clearing current read from the manufacturer’s curve at the entered time. Use the manufacturer’s curve to determine disconnection time.

The adiabatic calculation is S = Iₑꜰ√t/k for the entered duty. Check the maximum relevant I²t and the applicable mechanical minimum separately. NEC Article 250 describes the effective ground-fault current path and has its own conductor sizing requirements.