Worked example · IEC 60364 · NEC 250 context

Long outbuilding circuit

TN-S and TN-C-S loop impedance, protection threshold and adiabatic CPC area.

A long phase and CPC run makes the circuit resistances dominate the upstream contribution. The branch is close to the trip threshold.

Device threshold shortfall

Compared with the pickup for the selected protective device.

Fault loop impedance
2.073 Ω
Earth-fault current
105.4 A
Maximum permissible Zₛ
1.748 Ω
CPC area at modeled current
0.57967 mm²

Inputs

Circuit return path
V
×
Ω
Ω
Ω
×
Protection and CPC
A
s
A√s/mm²
Use the value for the material, insulation and starting temperature.

Phase-to-PE fault loop

Live schematic
Loop Zs2.073 ΩFault current105.4 AZs limit1.748 ΩCPC area0.5797 mm²TN-C-S · METALLIC LOOPR₁ phase 0.845 ΩR₂ protective 0.988 ΩSource / PENFaulted loadZₑ 0.24 ΩPROTECTIVE DEVICE CHECKProspective earth-fault current105.4 ADevice threshold125 ALoop impedance headroom-0.325 ΩLoop impedance / limit118.6%
The fault returns on PE and, in TN-C-S, through the upstream PEN. The parallel earth paths are omitted.

Derived values & comparisons
Protective device threshold125 A
Zₛ headroom-0.325 Ω
Fault current above threshold-19.597 A
Warm phase / CPC resistance0.845 Ω / 0.988 Ω
Next size for modeled fault duty0.75 mm²
Supply voltage after cₘᵢₙ218.5 V

Screening scope. Verify actual loop impedance, the manufacturer’s clearing curve and device breaking capacity. Size the CPC for worst-case let-through I²t and the applicable minimum area. NEC 250 uses separate bonding and equipment grounding provisions.

Try this. Reduce R₂ to represent a larger CPC and compare the effect on loop impedance with its thermal area requirement.

Calculation method

IEC 60364-4-41 and IEC 60364-5-54. Zₛ = Zₑ + (R₁ + R₂) × temperature factor, with the floor current Iₑꜰ = U₀cₘᵢₙ/Zₛ and limit Zₛ,ₘₐₓ = U₀cₘᵢₙ/Iₐ. Resistances are added as a scalar screening approximation.

The B, C and D defaults use 5, 10 and 20 times In, respectively. For a gG fuse, enter the total-clearing current read from the manufacturer’s curve at the entered time. Use the manufacturer’s curve to determine disconnection time.

The adiabatic calculation is S = Iₑꜰ√t/k for the entered duty. Check the maximum relevant I²t and the applicable mechanical minimum separately. NEC Article 250 describes the effective ground-fault current path and has its own conductor sizing requirements.

Standards and model assumptions