Worked example · IEC 60364 · NEC 250 context

TN-C-S C20 workshop branch

TN-S and TN-C-S loop impedance, protection threshold and adiabatic CPC area.

A workshop supply splits the upstream PEN at the intake. The downstream branch has a separate CPC and a C20 device.

Device threshold met

Compared with the pickup for the selected protective device.

Fault loop impedance
0.82 Ω
Earth-fault current
266.46 A
Maximum permissible Zₛ
1.0925 Ω
CPC area at modeled current
1.1785 mm²

Inputs

Circuit return path
V
×
Ω
Ω
Ω
×
Protection and CPC
A
s
A√s/mm²
Use the value for the material, insulation and starting temperature.

Phase-to-PE fault loop

Live schematic
Loop Zs0.82 ΩFault current266.5 AZs limit1.093 ΩCPC area1.179 mm²TN-C-S · METALLIC LOOPR₁ phase 0.275 ΩR₂ protective 0.325 ΩSource / PENFaulted loadZₑ 0.22 ΩPROTECTIVE DEVICE CHECKProspective earth-fault current266.5 ADevice threshold200 ALoop impedance headroom0.2725 ΩLoop impedance / limit75.06%
The fault returns on PE and, in TN-C-S, through the upstream PEN. The parallel earth paths are omitted.

Derived values & comparisons
Protective device threshold200 A
Zₛ headroom0.2725 Ω
Fault current above threshold66.463 A
Warm phase / CPC resistance0.275 Ω / 0.325 Ω
Next size for modeled fault duty1.5 mm²
Supply voltage after cₘᵢₙ218.5 V

Screening scope. Verify actual loop impedance, the manufacturer’s clearing curve and device breaking capacity. Size the CPC for worst-case let-through I²t and the applicable minimum area. NEC 250 uses separate bonding and equipment grounding provisions.

Try this. Compare the trip threshold with the fault current after increasing the temperature factor.

Calculation method

IEC 60364-4-41 and IEC 60364-5-54. Zₛ = Zₑ + (R₁ + R₂) × temperature factor, with the floor current Iₑꜰ = U₀cₘᵢₙ/Zₛ and limit Zₛ,ₘₐₓ = U₀cₘᵢₙ/Iₐ. Resistances are added as a scalar screening approximation.

The B, C and D defaults use 5, 10 and 20 times In, respectively. For a gG fuse, enter the total-clearing current read from the manufacturer’s curve at the entered time. Use the manufacturer’s curve to determine disconnection time.

The adiabatic calculation is S = Iₑꜰ√t/k for the entered duty. Check the maximum relevant I²t and the applicable mechanical minimum separately. NEC Article 250 describes the effective ground-fault current path and has its own conductor sizing requirements.

Standards and model assumptions