GroundGridLab · IEC 62305-3 · NFPA 780
Custom sphere over an outdoor vault
A project sensitivity case uses a 25 m sphere and a large gap between mast tips above a vault.
Clearance or separation shortfall. Compare centerline clearance and the available separation against the simplified model.
- Sphere radius
- 25 m
- Single-mast reach
- 4.0048 m
- Midspan clearance
- -3.1848 m
- Required separation
- 0.3025 m
Inputs
| Lightning protection level | Custom sphere |
|---|---|
| Custom sphere radius | 25 m |
| Equal mast height | 12 m |
| Object height above datum | 7 m |
| Mast center spacing | 37 m |
| LPS factor kᵢ | 0.055 × |
| Current sharing k꜀ | 0.5 × |
| Insulating material kₘ | 1 × |
| Length to bonding point | 11 m |
| Available separation | 0.8 m |
Derived values
| Midspan sag | 8.1848 m |
|---|---|
| Midspan envelope height | 3.8152 m |
| Single mast effective height | 12 m |
| Span must be below | 50 m |
| Separation margin | 0.4975 m |
| Lightning protection factor kᵢ | 0.055 × |
Evaluate the whole site in 3D, including roof edges, sides, other strike points and current paths. The separation-distance screen uses simplified IEC factors.