HeatExchangerLab

Square-pitch glycol shell

Glycol flows outside a square-pitch bundle at a viscosity appreciably higher than water.

Segmental baffle cutaway

Aₛ = DₛB(p − Dₒ)/p · Nu = 0.36 Re⁰·⁵⁵ Pr¹ᐟ³ (μ/μwall)⁰·¹⁴

Edit inputs ↓
Crossflow area
0.0252m²
Shell velocity
0.95238m/s
Shell hₒ
2,216.5W/(m²·K)
Shell ΔP
84.958kPa
Segmental baffle cutawaySHELL INLET →SEGMENTAL CUT19 baffles28 % of shell IDB/Dₛ 0Spacing windowB/Dₛ 1.35
The baffle cut sets the drawn window. The spacing marker shows the entered B/Dₛ compared with the screening band.
  • Kern coefficients use the nominal 25% cut. The window geometry reflects the entered cut.

Inputs

m
m
%
m
L/min
kg/m³
mPa·s
mPa·s
W/(m·K)
kJ/(kg·K)

Calculated results

Bundle crossflow area
0.0252 m²
Crossflow velocity
0.95238 m/s
Shell-side film hₒ
2,216.5 W/(m²·K)
Shell-side pressure drop
84.958 kPa
Equivalent diameter
21.941 mm
Shell Reynolds number
4,239.6
Gross baffle window
0.048677 m²
Estimated segmental baffles
19
Crossflow sections
20
Shell mass flux
1,004.8 kg/(m²·s)
Prandtl number
46.933
Kern friction factor
0.36388
Baffle spacing / shell ID
0.40385
Screening minimum spacing
0.104 m

Worked solution

Preset calculation · Metric SI

  1. From the shell bore, spacing, and clear pitch, find 0.0252 m² available for crossflow.
  2. Use the pitch cell to obtain a hydraulic equivalent diameter of 21.941 mm and Reynolds number of 4,239.6.
  3. Apply the Kern screen across 20 sections to estimate 2,216.5 W/(m²·K) for hₒ and 84.958 kPa for pressure loss.

Compare square and triangular equivalent diameters. Watch Reynolds number and the resulting change in hₒ.

Calculation basis

Kern crossflow area uses the notional tube row at the shell equator. Equivalent diameter comes from the open area and wetted perimeter of a square or triangular pitch cell.

The 25% nominal baffle-cut correlation estimates shell-side hₒ and pressure drop. The entered cut changes the gross segment window and diagram. Leakage, bypass, window obstructions, and nozzle losses require a more detailed method.

The spacing screen runs from the larger of 0.2Dₛ and 50 mm to Dₛ. Maximum unsupported length and vibration depend on the actual tube material and layout.

Methodology and references