HeatExchangerLab

Wide baffle spacing on an existing exchanger

An existing shell uses a spacing larger than the internal diameter.

Segmental baffle cutaway

Aₛ = DₛB(p − Dₒ)/p · Nu = 0.36 Re⁰·⁵⁵ Pr¹ᐟ³ (μ/μwall)⁰·¹⁴

Edit inputs ↓
Crossflow area
0.0522m²
Shell velocity
0.32567m/s
Shell hₒ
2,645.4W/(m²·K)
Shell ΔP
3.5299kPa
Segmental baffle cutawaySHELL INLET →SEGMENTAL CUT7 baffles25 % of shell IDB/Dₛ 0Spacing windowB/Dₛ 1.35
The baffle cut sets the drawn window. The spacing marker shows the entered B/Dₛ compared with the screening band.
  • Baffle spacing falls outside the preliminary spacing window.
  • Gross baffle window is smaller than the bundle crossflow area. Check window velocity and leakage separately.

Inputs

m
m
%
m
L/min
kg/m³
mPa·s
mPa·s
W/(m·K)
kJ/(kg·K)

Calculated results

Bundle crossflow area
0.0522 m²
Crossflow velocity
0.32567 m/s
Shell-side film hₒ
2,645.4 W/(m²·K)
Shell-side pressure drop
3.5299 kPa
Equivalent diameter
18.849 mm
Shell Reynolds number
6,150.8
Gross baffle window
0.031093 m²
Estimated segmental baffles
7
Crossflow sections
8
Shell mass flux
326.32 kg/(m²·s)
Prandtl number
6.7419
Kern friction factor
0.33904
Baffle spacing / shell ID
1.2889
Screening minimum spacing
0.09 m

Worked solution

Preset calculation · Metric SI

  1. From the shell bore, spacing, and clear pitch, find 0.0522 m² available for crossflow.
  2. Use the pitch cell to obtain a hydraulic equivalent diameter of 18.849 mm and Reynolds number of 6,150.8.
  3. Apply the Kern screen across 8 sections to estimate 2,645.4 W/(m²·K) for hₒ and 3.5299 kPa for pressure loss.

Check the upper spacing limit and compute the approximate number of crossflow sections. Mechanical support and vibration need their own check.

Calculation basis

Kern crossflow area uses the notional tube row at the shell equator. Equivalent diameter comes from the open area and wetted perimeter of a square or triangular pitch cell.

The 25% nominal baffle-cut correlation estimates shell-side hₒ and pressure drop. The entered cut changes the gross segment window and diagram. Leakage, bypass, window obstructions, and nozzle losses require a more detailed method.

The spacing screen runs from the larger of 0.2Dₛ and 50 mm to Dₛ. Maximum unsupported length and vibration depend on the actual tube material and layout.

Methodology and references