An existing oil service exchanger has a known 118 m² of outside surface and a revised service U.

Terminal temperature profile

Q = U × A × Fₜ × ΔTₗₘ

Edit inputs ↓
Area needed
125.33m²
LMTD
62.274K
Fₜ factor
1
Rated duty
3,012.8kW
Terminal temperature profile190 °C132 °C121 °C76 °CHOT STREAM →← COLD STREAMEnd AEnd BFₜ 00.75 screenFₜ 1
The lines join terminal temperatures along the hot-stream direction. Shell cases use a counterflow reference for the temperature plot.
  • Available surface falls short of the target duty.

Inputs

°C
°C
°C
°C
kW
W/(m²·K)
m²

Calculated results

Required surface
125.33 m²
Log mean ΔT
62.274 K
Correction factor Fₜ
1
Available duty
3,012.8 kW
Target duty
3,200 kW
Corrected mean ΔT
62.274 K
Terminal difference A
69 K
Terminal difference B
56 K
Cold temperature ratio P
0.39474
Stream temperature ratio R
1.2889
Duty reserve vs. target
-5.8495 %

Worked solution

Preset calculation · Metric SI

  1. Pair the terminal temperatures to obtain 69 K and 56 K. Their log mean is 62.274 K.
  2. Use P = 0.39474 and R = 1.2889 for the shell correction where applicable. Fₜ = 1.
  3. Divide 3,200 kW by 410 W/(m²·K) times the corrected drive of 62.274 K to obtain 125.33 m².

Compare available duty with the 3.2 MW target. Adjust service U to see the coefficient needed at fixed surface.

Calculation basis

Enter four terminal temperatures, a target duty, and a service U. Required surface meets the target duty at the specified conditions. Available duty rates the entered surface at those same conditions.

The two terminal differences define ΔTₗₘ. Equal terminal differences give that exact difference. Parallel and counterflow use Fₜ = 1 with their own terminal pairing.

For ideal 1–2 and 2–4 shell arrangements, Fₜ corrects the counterflow mean using Bowman–Mueller–Nagle P and R. Fₜ below 0.75 warrants a layout review. Terminal temperatures must also lie inside the feasible Fₜ domain.