Shell-and-tube count, velocity & pressure drop
Lay out a preliminary tube bundle, balance pass counts, and screen tube-side velocity and pressure loss.
Tube bundle and pass routing
ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2
- Required tubes
- 294
- Tube velocity
- 1.0128m/s
- Tube ΔP
- 10.664kPa
- Reynolds
- 19.35K
- Within the displayed screening checks.
Inputs
Calculated results
- Required tubes
- 294
- Tube velocity
- 1.0128 m/s
- Tube-side pressure drop
- 10.664 kPa
- Tube Reynolds number
- 19,354
- Estimated tubes that fit
- 432
- Tubes per pass
- 147
- Installed outside area
- 84.457 m²
- Tube inside diameter
- 15.748 mm
- Tube center pitch
- 23.812 mm
- Straight tube loss
- 8.6229 kPa
- Return pass loss
- 2.0414 kPa
- Darcy friction factor
- 0.027716
Calculation basis
Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.
The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.
Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.
Methodology and references