HeatExchangerLab

Shell-and-tube count, velocity & pressure drop

Lay out a preliminary tube bundle, balance pass counts, and screen tube-side velocity and pressure loss.

Tube bundle and pass routing

ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2

Edit inputs ↓
Required tubes
294
Tube velocity
1.0128m/s
Tube ΔP
10.664kPa
Reynolds
19.35K
Tube bundle and pass routing30° tube pitch2 passes · 147 tubes/pass0Liquid velocity3.6 m/s
The section shows a sample of the selected pitch lattice. The routing shows the selected number of tube passes.
  • Within the displayed screening checks.

Inputs

m
m²
m
mm
L/min
kg/m³
mPa·s
mm

Calculated results

Required tubes
294
Tube velocity
1.0128 m/s
Tube-side pressure drop
10.664 kPa
Tube Reynolds number
19,354
Estimated tubes that fit
432
Tubes per pass
147
Installed outside area
84.457 m²
Tube inside diameter
15.748 mm
Tube center pitch
23.812 mm
Straight tube loss
8.6229 kPa
Return pass loss
2.0414 kPa
Darcy friction factor
0.027716

Calculation basis

Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.

The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.

Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.

Methodology and references