Four-pass bundle on square pitch
One-inch tubes are arranged in square pitch to leave mechanical cleaning lanes.
Tube bundle and pass routing
ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2
- Required tubes
- 228
- Tube velocity
- 0.94578m/s
- Tube ΔP
- 15.767kPa
- Reynolds
- 24.31K
- Within the displayed screening checks.
Inputs
Calculated results
- Required tubes
- 228
- Tube velocity
- 0.94578 m/s
- Tube-side pressure drop
- 15.767 kPa
- Tube Reynolds number
- 24,311
- Estimated tubes that fit
- 324
- Tubes per pass
- 57
- Installed outside area
- 78.232 m²
- Tube inside diameter
- 21.184 mm
- Tube center pitch
- 31.75 mm
- Straight tube loss
- 10.426 kPa
- Return pass loss
- 5.3401 kPa
- Darcy friction factor
- 0.028856
Worked solution
Preset calculation · Metric SI
- Divide the required area by the area per tube and round up to a complete pass grouping. The result is 228 tubes.
- Put the flow through 57 tubes per pass. The resulting tube speed and Reynolds number are 0.94578 m/s and 24,311.
- Add 10.426 kPa of straight loss and 5.3401 kPa of return loss.
Read the added minor loss from three reversals. A change to triangular pitch changes the fit estimate while leaving required area and pass hydraulics fixed.
Calculation basis
Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.
The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.
Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.
Methodology and references