Tube bundle constrained by an existing shell
A retrofit must fit an existing shell even though the updated duty requires considerably more surface.
Tube bundle and pass routing
ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2
- Required tubes
- 472
- Tube velocity
- 0.50822m/s
- Tube ΔP
- 1.9515kPa
- Reynolds
- 13.63K
- The required tube count exceeds the estimated centered bundle capacity.
- Tube velocity is below the 0.9 m/s fouling screen.
Inputs
Calculated results
- Required tubes
- 472
- Tube velocity
- 0.50822 m/s
- Tube-side pressure drop
- 1.9515 kPa
- Tube Reynolds number
- 13,627
- Estimated tubes that fit
- 144
- Tubes per pass
- 236
- Installed outside area
- 158.19 m²
- Tube inside diameter
- 22.098 mm
- Tube center pitch
- 35.56 mm
- Straight tube loss
- 1.4375 kPa
- Return pass loss
- 0.51399 kPa
- Darcy friction factor
- 0.02943
Worked solution
Preset calculation · Metric SI
- Divide the required area by the area per tube and round up to a complete pass grouping. The result is 472 tubes.
- Put the flow through 236 tubes per pass. The resulting tube speed and Reynolds number are 0.50822 m/s and 13,627.
- Add 1.4375 kPa of straight loss and 0.51399 kPa of return loss.
Compare the required count with the centered-lattice estimate. Increase tube length or shell ID to explore how the fit changes.
Calculation basis
Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.
The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.
Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.