HeatExchangerLab

Two-pass utility-water tube bundle

A triangular bundle provides about 100 m² of external area in two circuit passes.

Tube bundle and pass routing

ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2

Edit inputs ↓
Required tubes
336
Tube velocity
1.0085m/s
Tube ΔP
10.915kPa
Reynolds
19.51K
Tube bundle and pass routing30° tube pitch2 passes · 168 tubes/pass0Liquid velocity3.6 m/s
The section shows a sample of the selected pitch lattice. The routing shows the selected number of tube passes.
  • Within the displayed screening checks.

Inputs

m
m²
m
mm
L/min
kg/m³
mPa·s
mm

Calculated results

Required tubes
336
Tube velocity
1.0085 m/s
Tube-side pressure drop
10.915 kPa
Tube Reynolds number
19,509
Estimated tubes that fit
474
Tubes per pass
168
Installed outside area
100.54 m²
Tube inside diameter
15.748 mm
Tube center pitch
23.812 mm
Straight tube loss
8.8907 kPa
Return pass loss
2.0239 kPa
Darcy friction factor
0.027672

Worked solution

Preset calculation · Metric SI

  1. Divide the required area by the area per tube and round up to a complete pass grouping. The result is 336 tubes.
  2. Put the flow through 168 tubes per pass. The resulting tube speed and Reynolds number are 1.0085 m/s and 19,509.
  3. Add 8.8907 kPa of straight loss and 2.0239 kPa of return loss.

Check that required tube count is a multiple of two, then compare tube velocity, estimated fit, and return loss.

Calculation basis

Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.

The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.

Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.

Methodology and references