Starting estimate
Four of the fifteen posts flank gates. If the gates need fixed positions, run the bay estimate separately for each measured fence section.
- Posts to set
- 15
- Gate posts included
- 4
- Fence bays
- 12
- Whole bags per post
- 3
How the estimate works
- Subtract gate center-to-center widths from the run and distribute the remaining length evenly between fence sections. Divide each section into bays within the spacing limit.
- Subtract the post width from each bay’s center span to find the clear picket width. Divide by picket pitch, accounting for the first and last board.
- Estimate concrete as round hole volume minus submerged square post volume. Round up by the selected bag yield per hole or for a combined pour.
Questions and answers
How does the model distribute bays when there are two gates?
It treats the two gates as separators and divides the remaining length equally into three sections. It rounds each section up to full bays.
Does the two-gate count work for one double-leaf driveway gate?
Use one opening for a double-leaf gate that shares a clear opening. Two openings in this model have four separate gate-side posts.