Starting estimate
Two short bays fit on either side of the middle gate. The railing and picket rows exclude the gate leaf.
- Posts to set
- 6
- Gate posts included
- 2
- Fence bays
- 4
- Fence rails
- 8
How the estimate works
- Subtract gate center-to-center widths from the run and distribute the remaining length evenly between fence sections. Divide each section into bays within the spacing limit.
- Subtract the post width from each bay’s center span to find the clear picket width. Divide by picket pitch, accounting for the first and last board.
- Estimate concrete as round hole volume minus submerged square post volume. Round up by the selected bag yield per hole or for a combined pour.
Questions and answers
Why does the short side-yard fence still need six posts?
There are four fence bays, one gate opening, and six post positions along the line. The gate opening adds a span with no fence rails.
Which fence inputs change if I replace the 3 ft gate with a wider leaf?
Measure the new clear opening. Changes to the gate width change the remaining straight sections and may change the number of fence bays.