How the estimate works
- Subtract gate center-to-center widths from the run and distribute the remaining length evenly between fence sections. Divide each section into bays within the spacing limit.
- Subtract the post width from each bay’s center span to find the clear picket width. Divide by picket pitch, accounting for the first and last board.
- Estimate concrete as round hole volume minus submerged square post volume. Round up by the selected bag yield per hole or for a combined pour.
Questions and answers
Are gate posts already included in the fence post count?
Yes. Each opening uses two distinct posts in this straight-run model. The rails and pickets listed are for fence bays and exclude gate infill.
What picket width should I enter for nominal 1×6 fence boards?
Measure the board across its face. A nominal 1×6 commonly measures 5½ inches wide, but actual stock can vary.
Why are there two totals for the fence concrete bags?
The combined pour rounds only once across all holes. The per-hole order rounds each footing individually, which helps when partial bags are impractical to share.