Landscape calculator

Segmental Retaining Wall Block, Cap, Backfill & Drainage Calculator

Estimate retaining wall block courses, caps, drainage gravel, pipe, fabric, and batter from wall and block dimensions.

Project inputs

Wall size and units
ft
in
in
in
in
in
%
in
Drainage detail
in
lb/ft³
ft
in

Material & layout estimate

Wall blocks to buy

95
Cap units to buy
26
Block courses
5
Full block stack height
30 in
Block face area per unit
0.6667 ft²
Drainage gravel volume
2.22 yd³
Drainage gravel weight
2.85 US tons
Perforated pipe along wall
24 ft
Solid outlet extension
6 ft
Geotextile with lap
132 ft²
Total batter setback
3 in

Check geogrid, embedment, soil, and outlet details against the selected wall system. Lower walls can require reinforcement too.

Gravel is the gross drainage column behind the blocks. Add separate material for hollow cores and the leveling pad as needed.

Wall batter & drainage section Schematic
Wall batter & drainage sectionWall blocks to buy: 95. Cap units to buy: 26. Block courses: 5. Full block stack height: 30 in BLOCK / BACKFILL24 in exposedWALL TAKEOFF5 full courses30 in stack height3 in total setback12 in drainage column2.22 yd³ drainage gravelCheck system details

How the estimate works

  1. Add the exposed and buried heights, then round up to full block courses. Divide the run into whole block positions and add the selected allowance to blocks and caps.
  2. Use the rounded block-stack height for the rectangular drainage gravel envelope. Estimate the fabric from the rear face, top, bottom, and one longitudinal lap.
  3. Use one perforated pipe run along the wall and the entered solid outlet extension. Total batter is one setback for each course above the first.

Questions and answers

Do buried courses count when estimating retaining wall blocks?

Yes. Add buried height before rounding up to whole courses. The drainage gravel estimate also uses the rounded stack height.

Will a wall that falls below the height alert always work without geogrid?

The alert uses a planning threshold. Manufacturer limits, soil type, backslope, water, and surcharge can trigger a design review at lower heights.

How is geotextile measured behind segmental block?

This estimate covers the soil-facing side of the drainage column, its top and bottom, and a lap along the wall. Verify panel overlaps and terminations in the selected detail.