Emergency Egress Lighting

Screen NFPA 101 floor illuminance and uniformity at startup and 90 minutes, then estimate inverter VA and battery Ah.

Path and initial readings
ft
ft
fc
fc
fc
Emergency circuit and inverter
lm/W
W
VA
×
Initial avg.
1.35fc
90-min avg.
0.92fc
Worst max:min
17.2:1
Battery bank
8.52Ah

Initial and 90-minute path light levels

Edit inputs ↓
Initial and 90-minute path light levelsEGRESS FLOOR LEVELSURVEY RANGESInitial surveyavg 1.35 fc90-minute surveyavg 0.92 fcPath 96 ft40:1 limitWorst uniformity17.2:1
Markers show the minimum, mean and maximum for the entered survey. The ranges do not assign values to specific points on the path.

NFPA 101 egress screen

Within screen
OutsideThresholdWithin
  • Initial mean1.35 / ≥ 1 fc within screen
  • Initial minimum0.18 / ≥ 0.1 fc within screen
  • 90-minute mean0.918 / ≥ 0.6 fc within screen
  • 90-minute minimum0.122 / ≥ 0.06 fc within screen
  • Initial max / min17.222 / ≤ 40 :1 within screen
  • 90-minute max / min17.222 / ≤ 40 :1 within screen

The 90-minute light floors are 60% of the initial code floors. The 40:1 limit applies to both readings.

Additional readings
Walking surface area576ft²
Total initial fixture output9,120lm
Emitted flux per floor area15.83lm/ft²
Initial minimum0.18fc
Initial maximum3.1fc
Initial max / min17.22:1
90-minute minimum0.12fc
90-minute maximum2.11fc
90-minute max / min17.22:1
Inverter real load96W
Inverter apparent load120VA
Assumed fixture power factor0.8
Estimated DC current4.55A
DC energy before derating163.64Wh

Calculation method

Use floor-level readings along the egress route. Enter measured 90-minute values where available, or apply the same end-of-discharge factor to each initial reading.

NFPA 101 screening floors
Initial avg ≥ 1 fc, min ≥ 0.1 fc · At 90 min avg ≥ 0.6 fc, min ≥ 0.06 fc
Uniformity at both times
Emax/Emin ≤ 40:1 · a zero minimum fails the screen
Inverter and battery
VAload = count × VA per fixture · Ah = Wload × 1.5 h × derating/(VDC × η)

Confirm the locally adopted edition, listed emergency equipment, inrush and battery discharge curves. Field-test the full required emergency duration.