Worked example
USBR 3 ft Parshall flume
A standard 3 ft Parshall flume has Hₐ = 2.10 ft and Hᵦ = 1.89 ft, matching the head pair in the USBR correction example.
Inputs
Hydraulic readout
Above Parshall modular limit
Free discharge: 38.465 cfs, Villemonte Q: 18.6457 cfs, Submergence ratio: 90%, Comparison limit: 70%
Input values
- Device geometry
- Parshall flume
- Upstream head H₁
- 2.1 ft
- Downstream head H₂
- 1.89 ft
- Standard throat width
- 3 ft
- Use H₁ = Hₐ and H₂ = Hᵦ at the prescribed taps. Villemonte is a sensitivity estimate only. Apply the USBR flume-specific correction chart above 70%.
Calculation details
- Effective width
- 3 ft
- Head exponent
- 1.57
- Villemonte multiplier
- 0.484746
- Parshall calibration K (ft/cfs basis)
- 12
Interpreting this example
The free-flow rating is about 38.4 cfs. At 90% submergence, USBR Figure 8-16 gives a 3.5 cfs correction times 2.4, for 30.0 cfs. Use the Villemonte value for sensitivity only.
Qfree ∝ H₁ⁿ · Qsub / Qfree = [1 − (H₂/H₁)ⁿ]⁰·³⁸⁵
Francis subtracts 0.1H₁ per contracted end. Kindsvater–Shen uses an angle-dependent effective coefficient and head correction. Parshall sizes use the USBR Table 8-6 calibration in feet and cfs.
The 60% weir marker is a comparison screen. Use the USBR correction charts when Hᵦ/Hₐ exceeds 70% for these Parshall sizes. Check approach conditions, nappe ventilation and calibration limits.
Worked examples
Open a case to load its inputs and interpretation.
- Suppressed rectangular lab weirA full-width, ventilated thin-plate weir spans a 1.1 m test channel with 0.24 m of measured head.
- Two-end Francis weirA 5 ft clear crest in a wider approach channel has two contracted ends and 0.85 ft of water head.
- 90° V-notch flow checkA fully contracted 90° thin-plate notch measures a 0.18 m upstream head from the notch apex.
- 60° V-notch on a small turnoutA small turnout box has a 60° notch and an upstream gauge reading of 0.13 m.
- 45° V-notch seepage monitorA measuring box at a drainage outlet has a 45° notch and a head of 0.081 m above the apex.
- Cipolletti field turnoutA 1.4 m Cipolletti crest rates irrigation delivery at H₁ = 0.34 m and H₂ = 0.10 m above crest.
- Broad-crested river controlA 4 m control crest has 0.64 m upstream head, 0.48 m downstream head and a specified critical-flow factor of 0.96.