Salt Cell Percent Setting for an 18,000-Gallon Pool Running 12 Hours
A fixed 12-hour pump schedule leaves half a day of potential generation. Divide the daily chlorine requirement by what the cell could make over those 12 hours at full output.
Raise salinity by 0 ppm. 68,137 L × 0 mg/L ÷ 1,000,000 = 0 kg salt.
0 lb ÷ 40 lb per bag = 0 bags. 0 kg ÷ 20 kg per bag = 0 bags.
Daily FC loss requires 0.376 lb Cl₂/day. Multiply the rated 1.6 lb/day by runtime ÷ 24 and duty ÷ 100 to get actual output.
With the entered 12 hr/day and 45% setting, the model produces 2.4 ppm FC per day.
Compare salt with a separate salinity test and use the cell manufacturer’s limits. A larger addition or unfamiliar reading calls for staged additions and a retest after circulation.
Common questions
How do I set a controller that only changes in five-point steps?
Use the estimate as a starting point and follow the manual. Watch the tested FC trend after a change and adjust in supported steps.
What if the pump runs 12 hours but the cell is idle part of that time?
Enter the actual hours with adequate flow and cell availability. A shorter effective schedule needs a higher duty percentage for the same output.
Raise salinity by 0 ppm. 68,137 L × 0 mg/L ÷ 1,000,000 = 0 kg salt.
0 lb ÷ 40 lb per bag = 0 bags. 0 kg ÷ 20 kg per bag = 0 bags.
Daily FC loss requires 0.376 lb Cl₂/day. Multiply the rated 1.6 lb/day by runtime ÷ 24 and duty ÷ 100 to get actual output.
With the entered 12 hr/day and 45% setting, the model produces 2.4 ppm FC per day.
Follow the cell and salt labels for operating limits and addition instructions. Verify salinity with a test kit after the salt dissolves and check free chlorine separately. Read the product label, wear the required protection and keep swimmers out during treatment. Never mix pool chemicals or chlorine types, and never add acid and chlorine together. Verify readings with a pool or spa test kit before adding chemicals and retest after circulation and before use.