ACI 318-19 §25.3 / §25.4 / §25.5

Epoxy top-cast Grade 80 bar

A coated large bar with close spacing exercises the combined top-cast and epoxy factor cap.

Edit inputs ↓

Inputs

Editable example

Bar & bond
Available geometry
Straight ℓd 92.73in
Hook ℓdh 47.84in
Class B lap 120.55in
Confinement 2 
AnatomyDiagrammatic scale
Parameter-linked development drawing. Diagrammatic scale. STRAIGHT BAR DEVELOPMENTRequired embedmentdb 1 inNeed 92.73 inHave 48 in

Screening

Limit exceeded
Required / available length193.2%
Straight tension bar93.2% over the threshold
  • Available embedmentAvailable length ≥ required length for the selected detail
    Outside limit
  • High-grade bar confinementKtr ≥ 0.5db for fy ≥ 80 ksi and spacing < 6 in
    Outside limit

Ordinary nonseismic tension details. Available length is measured along the straight bar or to the outside of the hook. Check minimum cover, bend fabrication and confinement at discontinuous ends separately.

Calculation readout
QuantityValue
Straight development ℓd92.73 in
Hook development ℓdh47.84 in
Class B with 1.3 × floored ℓd120.55 in
Confinement (cᵦ + Ktr)/db2
Nominal bar diameter db1 in
Spacing/cover term cᵦ2 in
Selected required length92.73 in
Class B minimum per §25.5.2120.55 in
Minimum inside bend diameter6 in
90° straight tail12 in
180° straight tail4 in
Top cast ψt1.3
Epoxy ψe (straight)1.5
Size ψs1
Grade ψg1.15
Hook confinement ψr1.6
Hook location ψo1.25
Hook concrete ψc0.867

Original example

Worked solution

Default calculator ↗

Starting inputs

Bar size
#8
Steel grade fy
80 ksi
Top-cast bar
Yes
Epoxy coated
Yes
Minimum clear cover
1.5 in
Bar spacing c/c
5 in
Available length
48 in

Calculated result

Straight development ℓd
92.73 in
Hook development ℓdh
47.84 in
Class B minimum per §25.5.2
120.55 in
Confinement (cᵦ + Ktr)/db
2

Apply ψg for the higher steel grade and cap ψtψe at 1.7. Check bond and cover details when selecting a longer embedment.

Preset screening · Straight tension bar · Limit exceeded

How the check works

Code basis ↗
  1. Use cᵦ = min(clear cover + db/2, bar spacing/2). Cap (cᵦ + Ktr)/db at 2.5, ψtψe at 1.7 and √f′c at 100. Calculate ℓd from Eq. (25.4.2.4a) with a 12 in floor.
  2. Check a Class B splice with the §25.5.2 minimum: multiply the unfloored ℓd by 1.3 and then apply the 12 in floor. The detail readout also shows 1.3 times the floored straight length for comparison.
  3. Use Eq. (25.4.3.1) and its own hook factors for ℓdh, subject to 8db and 6 in minima. A 90° hook needs a 12db tail; a 180° hook needs max(4db, 2.5 in). Check the outer bend envelope and tail run.