Measured slope on a lean-to metal roof
A lean-to has a measured slope of 12.75 ft. Add a 3-inch along-panel allowance at the eave when planning the cut list.
Worked calculation
Enter the measured diagonal directly. Adding the 3-inch extension gives a 13 ft cut length, and 27 ft of eave needs 14 panels at 24-inch coverage.
Change the inputs to test your own measurements. Reset restores this example.
Results
LiveCorrect the highlighted inputs to update your results.
- Total panels
- Panel cut length
- Panels per side
- Eave length with overhangs
- Last panel net strip
- Roof panel coverage
- Ridge or high-side trim
- Ridge or high-side pieces
- Rake trim
- Rake pieces
- Eave drip trim
- Eave drip pieces
- Closure strip length
- Closure strips
- Clip or screw positions
Worksheet inputs US customary
- Roof shape
- Shed · one side
- Panel length input
- Measured slope length
- Building length parallel to eave
- 26 ft
- Measured slope length per side
- 12.75 ft
- Rake overhang at each end
- 0.5 ft
- Extra cut length along slope
- 3 in
- Panel system
- Standing seam (clip estimate)
- Panel net coverage width
- 24 in
- Trim stock length
- 10 ft
- Overlap at each trim joint
- 0.5 ft
- Closure strip coverage per piece
- 3 ft
- Fastening points per 100 ft² (9.29 m²)
- 80
Apply this example to your roof
Match panel minimum slope, field detailing, clips, edge fastening and thermal movement to the system drawings. Confirm manufacturable cut lengths, delivery limits and exact trim and closure profiles before ordering.
Frequently asked questions
Why is the lean-to measured length entered without pitch conversion?
It already follows the slope. The calculation adds the overhang along the panel to that measurement.
What trim replaces ridge cap on the single-slope lean-to?
The calculator budgets one high-side run. Choose the actual high-side flashing for the wall or the exposed edge.