Measured slope on a lean-to metal roof

A lean-to has a measured slope of 12.75 ft. Add a 3-inch along-panel allowance at the eave when planning the cut list.

Worked calculation

Enter the measured diagonal directly. Adding the 3-inch extension gives a 13 ft cut length, and 27 ft of eave needs 14 panels at 24-inch coverage.

Change the inputs to test your own measurements. Reset restores this example.

Inputs

Units
Roof dimensions
ft
ft
ft
in
Panel and trim stock
ft
ft
ft
Use the clip or screw rate specified for your panel assembly.

Results

Live

Panel seams and trim layoutTotal panels 14. Panel cut length 13 ft. STANDING SEAM14 panels per sideCut 13 ftEave 27 ft
Panel seams and trim layout Schematic
Panels per side
14
Eave length with overhangs
27 ft
Last panel net strip
12 in
Roof panel coverage
351 ft²
Ridge or high-side trim
27 ft
Ridge or high-side pieces
3
Rake trim
26 ft
Rake pieces
4
Eave drip trim
27 ft
Eave drip pieces
3
Closure strip length
54 ft
Closure strips
18
Clip or screw positions
281

Apply this example to your roof

Match panel minimum slope, field detailing, clips, edge fastening and thermal movement to the system drawings. Confirm manufacturable cut lengths, delivery limits and exact trim and closure profiles before ordering.

Read the calculator method and references

Frequently asked questions

Why is the lean-to measured length entered without pitch conversion?

It already follows the slope. The calculation adds the overhang along the panel to that measurement.

What trim replaces ridge cap on the single-slope lean-to?

The calculator budgets one high-side run. Choose the actual high-side flashing for the wall or the exposed edge.