Metal trim stock with joint overlaps
A 24 ft shed roof high edge uses 10 ft flashing stock with a 1 ft overlap at each joint.
Worked calculation
Two stock pieces cover 19 ft after the lap. Three cover 28 ft, enough for the high side. Rake and eave pieces are counted as separate runs.
Change the inputs to test your own measurements. Reset restores this example.
Results
LiveCorrect the highlighted inputs to update your results.
- Total panels
- Panel cut length
- Panels per side
- Eave length with overhangs
- Last panel net strip
- Roof panel coverage
- Ridge or high-side trim
- Ridge or high-side pieces
- Rake trim
- Rake pieces
- Eave drip trim
- Eave drip pieces
- Closure strip length
- Closure strips
- Clip or screw positions
Worksheet inputs US customary
- Roof shape
- Shed · one side
- Panel length input
- Building span and pitch
- Building length parallel to eave
- 24 ft
- Full horizontal building span
- 12 ft
- Roof pitch
- 3:12
- Rake overhang at each end
- 0 ft
- Extra cut length along slope
- 2 in
- Panel system
- Ribbed (screw estimate)
- Panel net coverage width
- 24 in
- Trim stock length
- 10 ft
- Overlap at each trim joint
- 1 ft
- Closure strip coverage per piece
- 3 ft
- Fastening points per 100 ft² (9.29 m²)
- 80
Apply this example to your roof
Match panel minimum slope, field detailing, clips, edge fastening and thermal movement to the system drawings. Confirm manufacturable cut lengths, delivery limits and exact trim and closure profiles before ordering.
Frequently asked questions
Why does a 24-foot high side need three trim pieces?
At a 1 ft joint lap the first piece covers 10 ft and each following piece adds 9 ft. Two reach only 19 ft.
Can metal trim offcuts reduce the number of stock lengths?
Possibly. Make a cut list before purchase and verify lap direction and minimum usable offcut length. The estimate counts runs separately.