Metal Roof Panel Count, Length, Screws & Trim Calculator
Build a panel cut list for a symmetrical gable or shed, with trim, closures and fastening points.
Results
LiveCorrect the highlighted inputs to update your results.
- Total panels
- Panel cut length
- Panels per side
- Eave length with overhangs
- Last panel net strip
- Roof panel coverage
- Ridge or high-side trim
- Ridge or high-side pieces
- Rake trim
- Rake pieces
- Eave drip trim
- Eave drip pieces
- Closure strip length
- Closure strips
- Clip or screw positions
Worksheet inputs US customary
- Roof shape
- Gable · two equal sides
- Panel length input
- Building span and pitch
- Building length parallel to eave
- 48 ft
- Full horizontal building span
- 28 ft
- Roof pitch
- 4:12
- Rake overhang at each end
- 1 ft
- Extra cut length along slope
- 2 in
- Panel system
- Standing seam (clip estimate)
- Panel net coverage width
- 16 in
- Trim stock length
- 10 ft
- Overlap at each trim joint
- 0.5 ft
- Closure strip coverage per piece
- 3 ft
- Fastening points per 100 ft² (9.29 m²)
- 80
Build a preliminary panel cut list
- Enter the building length and rake overhang at each end. Use either one measured slope length or convert the horizontal span to slope length at the selected pitch. A gable has two equal runs.
- Divide the eave length by net coverage and round up per side. Add the along-slope extension to each cut length. The last strip is what remains after laying full widths.
- Runs are counted separately for ridge or high-side trim, rakes and eave drip trim. The first stock piece supplies its full length. Each later piece adds its length less one joint overlap.
Match panel minimum slope, field detailing, clips, edge fastening and thermal movement to the system drawings. Confirm manufacturable cut lengths, delivery limits and exact trim and closure profiles before ordering.
References
Frequently asked questions
What is the difference between sheet width and net metal panel coverage?
Net coverage is the amount of roof one installed panel covers after the seam or lap. Use that width for layout.
Does the panel tool handle a gable with unequal slopes?
Use two single-side estimates with their own slope measurements. Count a shared ridge run once in the combined order.
How are metal panel fastening points budgeted?
The calculator multiplies the installed panel area by the entered rate per 100 ft². Use the manufacturer’s fastening schedule for the actual layout.