Slope-factor sensitivity on a 12:12 roof
A 45° roof is used to explore how an illustrative slope factor changes the balanced pressure for a 60 psf ground value.
Worked calculation
The example curve gives Cs = (70 − 45) / 40 = 0.625. Apply it to the 42 psf flat estimate for a 26.25 psf sensitivity result.
Change the inputs to test your own measurements. Reset restores this example.
Results
LiveCorrect the highlighted inputs to update your results.
- Balanced sloped roof estimate
- Observed local layer pressure
- Balanced flat roof estimate
- Slope factor Cs
- Roof angle
- Balanced roof weight
- Balanced weight equivalent
- Same snow depth at powder density
- Same snow depth at wet-snow density
- Observed snow layer pressure
- Ice pressure over affected area
- Area-average observed pressure
- Observed roof weight
- Observed weight equivalent
- Entered comparison threshold
- Powder density assumption
- Wet snow density assumption
- Ice density assumption
- Selected snow density
- The illustrative slope curve is a sensitivity aid. Use a project-specific Cs for a code calculation.
Worksheet inputs US customary
- Horizontal roof area
- 1,400 ft²
- Ground snow load Pg
- 60 psf
- Exposure factor Ce
- 1×
- Thermal factor Ct
- 1×
- Roof pitch
- 12:12
- Slope factor source
- Illustrative 30°–70° curve
- Comparison threshold
- 32 psf
- Snow density
- Wet snow · dense
- Vertical snow depth
- 12 in
- Vertical ice thickness
- 1 in
- Projected roof area covered by ice
- 15%
Apply this example to your roof
A structural design needs the applicable code, hazard data, factors, minimums and load combinations. This balanced expression omits drift, sliding, rain-on-snow and localized effects. The entered threshold is a comparison input and cannot establish structural adequacy.
Frequently asked questions
Where does the 0.625 steep-roof slope factor come from?
It comes from the tool’s labeled illustrative curve. Use a project-specific Cs for an adopted-code design.
What happens if I enter a supplied Cs of 1.0 for the 45° roof?
The balanced estimate equals the 42 psf flat value. The actual choice depends on the assembly and the applicable standard.