Reverberation time example

Gymnasium panel capacity

A tall gym can only accept panels on a limited part of its side walls. Compare the 85-square-metre allowance with the area needed for a 1.2-second Sabine target.

Inputs

Room geometry
Surface absorption
Treatment plan

Use absorption coefficients for the same frequency band.

Sabine
5.182s
Eyring
4.999s
Fitzroy
5.179s
Panel area
—

Room section & absorption

Illustrative scale
Dimensioned room and treatment surfaceThe selected pair of surfaces is highlighted beside its absorption coefficient. A sample reflection links room geometry to decay.L 28 mW 16 mH 8 mPAIR ABSORPTIONαx 0.05αy 0.06αz 0.08PANEL COVERAGEInfeasible
TreatmentReflectionsDimensions

Target infeasible on selected faces

Limit

Even replacing both faces in this orientation cannot reach the target with the selected panel and model.

Target metPanels neededInfeasible

Calculation breakdown

Room volume
3,584 m³
Room surface area
1,600 m²
Equivalent absorption area
111.36 m²
Mean absorption α
0.0696
Treatment sizing model
Sabine
Baseline α of selected pair
0.06
Selected pair area
448 m²
Decay before treatment
5.182 s
Decay with proposed area
No feasible area
Best decay within allowance
3.279 s