Worked example · Controls & protection

Allowable release above the inflow peak

The allowable pre-development release already exceeds the expected post-development inflow for this duration.

Inputs

Design hydrograph
0–2,000 cfs
0–2,000 cfs
1–1,440 min
1–360 min
Basin storage
1–2,000 ft
1–2,000 ft
0–70 ft
0–12

Bottom dimensions define a rectangle. All four sides have the same slope.

Outlet rating
0–120 in
0.1–1
0–70 ft
0–150 ft
0.5–6 ft½/s
0–70 ft

Use a free side outlet with its lower edge at or above the basin bottom. Set the diameter or crest length to zero to omit it.

Detention hydrograph

Live results
Detention hydrograph No peak throttling required. Checks use the selected storm duration and report the outlet rating at the entered water depth. STORAGE REQ. 0 acre-ft BASIN VOLUME 0.086 acre-ft OUTLET RATING 1.27 cfs STORAGE LEFT 0.086 acre-ft Q · cfsPeak 4.8 cfs059 minInflowRelease 0No storage target—

No peak throttling required

Checks use the selected storm duration and report the outlet rating at the entered water depth.

Calculation results

Storage req.
0 acre-ft
Basin volume
0.086 acre-ft
Outlet rating
1.27 cfs
Storage reserve
0.086 acre-ft
Inflow volume
0.241 acre-ft
Storage peak time
32 min
Inflow ends
59 min
Orifice discharge
1.27 cfs
Weir discharge
0 cfs
Head above orifice center
1.7 ft
Head above weir crest
0 ft
Release rate reserve
5.33 cfs

Stage and outlet ratings

StageftStorageft³OrificecfsWeircfsTotalcfs
0.636710.0300.03
1.251,5060.6600.66
1.882,5251.0101.01
2.53,7441.2701.27

Worked calculation

The peak-flow storage screen reaches zero. Lower the allowable release to see the storage calculation engage.

Vreq = 60[Qin(tᵈ + t꜀/4) − Qout(tᵈ/2 + 3t꜀/4)] · Full orifice Qor = CᵈA√(2gh) · Qw = CʷLh³ᐟ².

The hydrograph assumes tᵈ ≥ t꜀, a 1.5 t꜀ recession and a linear release rising limb. Storage is set to zero when the allowable rate already meets the inflow peak. Test multiple IDF durations to find the controlling one. The steady-flow rating uses the EPA SWMM equivalent weir for a partly wetted side orifice and centerline head for a full opening. Downstream submergence and dynamic routing require a separate analysis.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.