Worked example · Controls & protection

Sharp-crested weir outlet rating

An outlet berm uses a rectangular overflow crest, with no low-flow orifice in this screening case.

Inputs

Design hydrograph
0–2,000 cfs
0–2,000 cfs
1–1,440 min
1–360 min
Basin storage
1–2,000 ft
1–2,000 ft
0–70 ft
0–12

Bottom dimensions define a rectangle. All four sides have the same slope.

Outlet rating
0–120 in
0.1–1
0–70 ft
0–150 ft
0.5–6 ft½/s
0–70 ft

Use a free side outlet with its lower edge at or above the basin bottom. Set the diameter or crest length to zero to omit it.

Detention hydrograph

Live results
Detention hydrograph Basin storage shortfall. Checks use the selected storm duration and report the outlet rating at the entered water depth. STORAGE REQ. 0.713 acre-ft BASIN VOLUME 0.623 acre-ft OUTLET RATING 6.48 cfs STORAGE LEFT -0.09 acre-ft Q · cfsPeak 16 cfs067 minInflowRelease 0Required storage2× required

Basin storage shortfall

Checks use the selected storm duration and report the outlet rating at the entered water depth.

Calculation results

Storage req.
0.713 acre-ft
Basin volume
0.623 acre-ft
Outlet rating
6.48 cfs
Storage reserve
-0.09 acre-ft
Inflow volume
0.942 acre-ft
Storage peak time
57.59 min
Inflow ends
66.5 min
Orifice discharge
0 cfs
Weir discharge
6.48 cfs
Head above orifice center
3.7 ft
Head above weir crest
0.5 ft
Release rate reserve
-1.48 cfs

Stage and outlet ratings

StageftStorageft³OrificecfsWeircfsTotalcfs
1.135,035000
2.2511.17K000
3.3818.5K000
4.527.13K06.486.48

Worked calculation

Compare the staged ratings to see how quickly discharge rises once water crosses the crest.

Vreq = 60[Qin(tᵈ + t꜀/4) − Qout(tᵈ/2 + 3t꜀/4)] · Full orifice Qor = CᵈA√(2gh) · Qw = CʷLh³ᐟ².

The hydrograph assumes tᵈ ≥ t꜀, a 1.5 t꜀ recession and a linear release rising limb. Storage is set to zero when the allowable rate already meets the inflow peak. Test multiple IDF durations to find the controlling one. The steady-flow rating uses the EPA SWMM equivalent weir for a partly wetted side orifice and centerline head for a full opening. Downstream submergence and dynamic routing require a separate analysis.