Worked example · Conveyance

Shallow HDPE pipe velocity

A smooth HDPE line carries a low-flow event on a shallow grade. The section is only one-tenth full.

Inputs

Pipe section
4–180 in
0–100 %
0–30 %

The full reference uses the same slope and roughness as the partial section.

Roughness and velocity
0.1–15 ft/s

Typical screening targets are 2–3 ft/s (about 0.6–0.9 m/s). Use your agency’s criterion.

Circular pipe section

Live results
Circular pipe section Velocity below the target. Self-cleansing screen at the entered depth and grade. PARTIAL FLOW 0.22 cfs FULL FLOW 10.4 cfs VELOCITY 1.33 ft/s Q / Q FULL 2.1 % Depth d0.2 ftPipe D24 inInvert 0Velocity target2× target

Velocity below the target

Self-cleansing screen at the entered depth and grade.

Calculation results

Partial flow
0.22 cfs
Full flow
10.4 cfs
Velocity
1.33 ft/s
Q / Q full
2.1 %
Full-flow velocity
3.31 ft/s
Velocity ratio
40.1 %
Flow depth
0.2 ft
Central angle θ
1.287 rad
Wetted area
0.16 ft²
Hydraulic radius
0.127 ft
Wetted perimeter
1.29 ft
Velocity reserve
-1.17 ft/s

Worked calculation

The pipe’s full-flow velocity can clear the target even when the shallow event does not. Compare the two velocity rows.

θ = 2 acos(1 − 2d/D) · A = D²(θ − sin θ)/8 · P = Dθ/2 · Q = K A R²ᐟ³ S¹ᐟ²/n.

Assumes uniform gravity flow with fixed Manning n and no backwater. At a zero slope the ratios compare section conveyance, while both discharges and velocities are zero. At high part-full depths Q can exceed its full-section reference because hydraulic radius is larger.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.