Worked example · Hydrology

Industrial yard and access drive runoff

An industrial lot has a compacted yard, paved drives and relatively little landscape. Compare the conventional rounded US coefficient with the physical unit conversion.

Inputs

Land cover
SurfaceArea (acre)C
Pavement
0–200 acre
0–1
Landscape
0–200 acre
0–1
Open ground
0–200 acre
0–1

Enter area and runoff coefficient for up to three surface categories. Set unused areas to zero.

Design storm
0–25 in/hr

Read intensity for the selected return period and duration from your local IDF data.

Kirpich flow path
10–20,000 ft
0.05–40 %

Use the longest hydraulic channel path and its average grade.

Catchment plan

Live results
Catchment plan Composite runoff estimate. Use rainfall intensity from the local IDF curve at the adopted design duration. PEAK FLOW 32 cfs COMPOSITE C 0.734 DRAINAGE AREA 8.9 acre KIRPICH T꜀ 5.96 min DivideOutfallPath · 860 ft 0 · no runoffComposite C1 · full runoff

Composite runoff estimate

Use rainfall intensity from the local IDF curve at the adopted design duration.

Calculation results

Peak flow
32 cfs
Composite C
0.734
Drainage area
8.9 acre
Kirpich t꜀
5.96 min
US-equivalent flow factor
1

Worked calculation

Toggle the flow conversion. The area, weighted C and travel time stay fixed while the peak changes by about 0.8%.

C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.

The exact US factor is 121/120 and is displayed as 1.0083. SI uses Q = C i A / 360 with i in mm/hr and A in ha. The rounded US convention uses 1.000. Kirpich estimates the channel travel component. Add sheet and shallow concentrated travel where applicable, and verify local minimum durations and area limits.