Worked example · Hydrology

School campus drainage peak

A school grounds catchment combines busy hardscape, an athletic field and a wooded edge. The longest channel path follows the field boundary.

Inputs

Land cover
SurfaceArea (acre)C
Pavement
0–200 acre
0–1
Landscape
0–200 acre
0–1
Open ground
0–200 acre
0–1

Enter area and runoff coefficient for up to three surface categories. Set unused areas to zero.

Design storm
0–25 in/hr

Read intensity for the selected return period and duration from your local IDF data.

Kirpich flow path
10–20,000 ft
0.05–40 %

Use the longest hydraulic channel path and its average grade.

Catchment plan

Live results
Catchment plan Composite runoff estimate. Use rainfall intensity from the local IDF curve at the adopted design duration. PEAK FLOW 22.31 cfs COMPOSITE C 0.399 DRAINAGE AREA 14.2 acre KIRPICH T꜀ 14.06 min DivideOutfallPath · 1,560 ft 0 · no runoffComposite C1 · full runoff

Composite runoff estimate

Use rainfall intensity from the local IDF curve at the adopted design duration.

Calculation results

Peak flow
22.31 cfs
Composite C
0.399
Drainage area
14.2 acre
Kirpich t꜀
14.06 min
US-equivalent flow factor
1.00833

Worked calculation

Change the flow-path grade to see how travel time responds. Revisit the IDF intensity separately when the adopted storm duration changes.

C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.

The exact US factor is 121/120 and is displayed as 1.0083. SI uses Q = C i A / 360 with i in mm/hr and A in ha. The rounded US convention uses 1.000. Kirpich estimates the channel travel component. Add sheet and shallow concentrated travel where applicable, and verify local minimum durations and area limits.