Top Up 1,200 ft² from R-19 to R-49 with Cellulose
A ranch attic has six inches of insulation with a documented R-19 rating. The selected cellulose label covers 40 ft² per bag at the needed added R-30. Bags are $16 each.
Try it Set coverage to zero to compare the label-based count with the density estimate. The label should govern the order when the product and added R match.
Results
Back to inputs ↑Enter valid inputs to calculate results and draw the diagram.
- Added settled depth
- in
- Whole bags
- Material cost
- USD
Bag quantity uses the entered label coverage at the added R.
Attic insulation section
- Existing insulation R
- R
- Added insulation R
- R
- Final insulation R
- R
- Total settled depth
- in
- Added installed load
- lb/ft²
- Added installed weight
- lb
Inputs used
- Open attic floor area
- 1,200 ft²
- Existing average depth
- 6 in
- Existing R-value source
- Enter known R
- Existing insulation R
- 19 R
- Target insulation R
- R-49
- Material to add
- Blown cellulose
- Cellulose R per thickness
- 3.5 R/in
- Settled cellulose density
- 1.5 lb/ft³
- Net cellulose bag weight
- 25 lb
- Label coverage per bag at the added R
- 40 ft²
- Price per bag or kit
- 16 USD
How this calculation works
Subtract the estimated or entered existing R from the target, with a minimum of zero. Divide that difference by R per inch to get added depth. The depth estimate uses 3.5 R/in for existing cellulose, 2.8 for fiberglass and 6.5 for closed-cell foam.
With no label coverage entered, the settled volume times density estimates installed mass. Divide by net bag weight and round up to buy whole bags. Manufacturer maximum coverage at the added R overrides the modeled bag coverage.
For closed-cell spray foam, divide area × depth in board feet by the entered usable kit yield and round up. Material totals exclude equipment, labor, tax and any project waste beyond the entered product yield.
Use the specific product’s settled-depth and coverage instructions when installing, and check air sealing, ventilation paths and equipment clearances before adding insulation.
References
Frequently asked questions
Does the cellulose label here need to say R-49 or R-30?
For this top-up, use the label entry for the R-30 you are adding. Existing R-19 already contributes to the final R-49 target.
Why do thirty bags cover this attic exactly?
The example label allows 40 ft² of coverage per bag at the selected added R. Dividing 1,200 by 40 gives 30, with no additional full bag needed by rounding.