WaterTreatLab

Ion exchange / Worked example

24 ft³ Softener for Boiler Makeup

Check the hardness load, interval, salt and service flow for a 24 ft³ sodium-cycle boiler makeup softener.

Inputs

Water & resin
gal/d
gpm
gpg
ft³
%
Run length & metals
d
d
mg/L
gpg per mg/L
mg/L
gpg per mg/L

Results

US customary
Run length
1.8053 d
Treated per cycle
32,496 gal
Salt per cycle
240 lb
Peak service loading
3.125 gpm/ft³ 25.065 BV/h
Sodium-cycle resin vesselLive diagram
Sodium-cycle resin vesselCapacity remaining after the entered time in service. Hard feedAdjusted hardness16.95 gpgPeak resin loading3.125 gpm/ft³Softened outletUsable capacity remaining58.456 %ExhaustedRegenerated
Capacity remaining after the entered time in service.
Adjusted hardness
16.95 gpg
Daily hardness load
305,100 grains/d
Usable capacity
550,800 grains
Rated capacity per resin volume
27,000 grains/ft³
Salt per 30 days
3,988.2 lb/30 d
Resin for target interval
26.588 ft³
Usable capacity remaining
58.456 %

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. Adjusted hardness is 16 + 5 × 0.15 + 5 × 0.04 = 16.95 gpg.
  2. Usable capacity is 24 × 27,000 × 0.85 = 550,800 grains. This treats about 32,496 gal, or 1.805 days at 18,000 gal/day.
  3. Each regeneration uses 24 × 10 = 240 lb salt. Peak service loading is 75 ÷ 24 = 3.125 gpm/ft³.

More worked examples

Equations & conventions

Compensated hardness
H = Hᵣₐw + kꜰₑ[Fe] + kₘₙ[Mn]

US hardness uses gpg, where 1 gpg is approximately 17.118 mg/L as CaCO₃. The editable default Fe/Mn allowances are planning inputs. Use the resin supplier’s corrections.

Usable capacity
C = Vᵣₑₛᵢₙ × Cᵣₐₜₑ𝒹 × (1 − reserve)

The planning curve uses 20,000, 27,000 and 30,000 grains/ft³ at 6, 10 and 15 lb salt/ft³. Capacity and leakage vary by resin and regeneration conditions.

Run length and resin volume
Vcycle = C / H, t = Vcycle / Qday

Daily hardness load is Qday × H. For resin at a target interval, multiply that load by the days and divide by usable capacity per unit resin.

Salt and service loading
Salt/regeneration = Vᵣₑₛᵢₙ × salt rate

Divide salt per regeneration by the run length and multiply by 30 for average 30-day consumption. Peak service flow divided by resin volume gives gpm/ft³ or bed volumes per hour.

Planning basis

The 1–5 gpm/ft³ service range is a C100 bulletin reference. Capacity can change with water chemistry, bed depth, flow and resin condition. Combined Fe/Mn above 0.5 mg/L calls for pretreatment and resin review under conventional waterworks guidance.

Questions

What limits run length in the boiler makeup example?

The entered daily hardness load exhausts the 85% usable resin capacity in about 1.8 days.