Evaluate the 15 lb/ft³ salt dose with 35 ft³ of sodium-cycle resin and 20 gpg hardness.

Inputs

Water & resin
gal/d
gpm
gpg
ft³
%
Run length & metals
d
d
mg/L
gpg per mg/L
mg/L
gpg per mg/L

Results

US customary
Run length
2.25 d
Treated per cycle
47,250 gal
Salt per cycle
525 lb
Peak service loading
3.4286 gpm/ft³ 27.5 BV/h
Sodium-cycle resin vesselLive diagram
Sodium-cycle resin vesselCapacity remaining after the entered time in service. Hard feedAdjusted hardness20 gpgPeak resin loading3.4286 gpm/ft³Softened outletUsable capacity remaining66.667 %ExhaustedRegenerated
Capacity remaining after the entered time in service.
Adjusted hardness
20 gpg
Daily hardness load
420,000 grains/d
Usable capacity
945,000 grains
Rated capacity per resin volume
30,000 grains/ft³
Salt per 30 days
7,000 lb/30 d
Resin for target interval
31.111 ft³
Usable capacity remaining
66.667 %

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. The input capacity curve gives 30,000 grains/ft³ at 15 lb salt/ft³.
  2. After a 10% reserve, 945,000 grains treats 47,250 gal. At 21,000 gal/day the cycle lasts 2.25 days and uses 525 lb salt.

More worked examples

Equations & conventions

Compensated hardness
H = Hᵣₐw + kꜰₑ[Fe] + kₘₙ[Mn]

US hardness uses gpg, where 1 gpg is approximately 17.118 mg/L as CaCO₃. The editable default Fe/Mn allowances are planning inputs. Use the resin supplier’s corrections.

Usable capacity
C = Vᵣₑₛᵢₙ × Cᵣₐₜₑ𝒹 × (1 − reserve)

The planning curve uses 20,000, 27,000 and 30,000 grains/ft³ at 6, 10 and 15 lb salt/ft³. Capacity and leakage vary by resin and regeneration conditions.

Run length and resin volume
Vcycle = C / H, t = Vcycle / Qday

Daily hardness load is Qday × H. For resin at a target interval, multiply that load by the days and divide by usable capacity per unit resin.

Salt and service loading
Salt/regeneration = Vᵣₑₛᵢₙ × salt rate

Divide salt per regeneration by the run length and multiply by 30 for average 30-day consumption. Peak service flow divided by resin volume gives gpm/ft³ or bed volumes per hour.

Planning basis

The 1–5 gpm/ft³ service range is a C100 bulletin reference. Capacity can change with water chemistry, bed depth, flow and resin condition. Combined Fe/Mn above 0.5 mg/L calls for pretreatment and resin review under conventional waterworks guidance.

Questions

How does the 15 lb/ft³ setting affect salt efficiency?

This planning curve yields 2,000 grains per pound of salt versus about 3,333 at 6 lb/ft³. Higher capacity per regeneration trades off against salt efficiency.