WaterTreatLab

Ion exchange / Worked example

Softening with Iron and Manganese Allowance

See how editable iron and manganese allowances affect adjusted hardness and a three-day resin target.

Inputs

Water & resin
gal/d
gpm
gpg
ft³
%
Run length & metals
d
d
mg/L
gpg per mg/L
mg/L
gpg per mg/L

Results

US customary
Run length
1.9938 d
Treated per cycle
19,938 gal
Salt per cycle
150 lb
Peak service loading
5.3333 gpm/ft³ 42.778 BV/h
Sodium-cycle resin vesselLive diagram
Sodium-cycle resin vesselCapacity remaining after the entered time in service. Hard feedAdjusted hardness16.25 gpgPeak resin loading5.3333 gpm/ft³Softened outletUsable capacity remaining62.384 %ExhaustedRegenerated
Capacity remaining after the entered time in service.
Review the operating point
  • Combined Fe/Mn exceeds 0.5 mg/L. Review pretreatment and resin limits for conventional sodium-cycle softening.
  • Peak loading exceeds 5 gpm/ft³. Check resin leakage and vessel hydraulics.
Adjusted hardness
16.25 gpg
Daily hardness load
162,500 grains/d
Usable capacity
324,000 grains
Rated capacity per resin volume
27,000 grains/ft³
Salt per 30 days
2,256.9 lb/30 d
Resin for target interval
22.569 ft³
Usable capacity remaining
62.384 %

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. Add 0.70 × 5 and 0.15 × 5 to 12 gpg for 16.25 gpg adjusted hardness.
  2. At 10,000 gal/day, load is 162,500 grains/day. The current resin delivers nearly two days.
  3. For three days, 487,500 grains ÷ 21,600 usable grains/ft³ requires about 22.57 ft³.

More worked examples

Equations & conventions

Compensated hardness
H = Hᵣₐw + kꜰₑ[Fe] + kₘₙ[Mn]

US hardness uses gpg, where 1 gpg is approximately 17.118 mg/L as CaCO₃. The editable default Fe/Mn allowances are planning inputs. Use the resin supplier’s corrections.

Usable capacity
C = Vᵣₑₛᵢₙ × Cᵣₐₜₑ𝒹 × (1 − reserve)

The planning curve uses 20,000, 27,000 and 30,000 grains/ft³ at 6, 10 and 15 lb salt/ft³. Capacity and leakage vary by resin and regeneration conditions.

Run length and resin volume
Vcycle = C / H, t = Vcycle / Qday

Daily hardness load is Qday × H. For resin at a target interval, multiply that load by the days and divide by usable capacity per unit resin.

Salt and service loading
Salt/regeneration = Vᵣₑₛᵢₙ × salt rate

Divide salt per regeneration by the run length and multiply by 30 for average 30-day consumption. Peak service flow divided by resin volume gives gpm/ft³ or bed volumes per hour.

Planning basis

The 1–5 gpm/ft³ service range is a C100 bulletin reference. Capacity can change with water chemistry, bed depth, flow and resin condition. Combined Fe/Mn above 0.5 mg/L calls for pretreatment and resin review under conventional waterworks guidance.

Questions

Why does the metals warning appear at 0.85 mg/L combined?

The sum exceeds the conventional sodium-cycle screening value. Verify pretreatment and resin suitability with supplier data and water tests.