WaterTreatLab

Ion exchange / Worked example

Softener Run Length at 6 lb/ft³ Salt

Estimate a salt-efficient 2.5-day cycle for 20 ft³ of resin treating 12 gpg feedwater.

Inputs

Water & resin
gal/d
gpm
gpg
ft³
%
Run length & metals
d
d
mg/L
gpg per mg/L
mg/L
gpg per mg/L

Results

US customary
Run length
2.5 d
Treated per cycle
30,000 gal
Salt per cycle
120 lb
Peak service loading
2.5 gpm/ft³ 20.052 BV/h
Sodium-cycle resin vesselLive diagram
Sodium-cycle resin vesselCapacity remaining after the entered time in service. Hard feedAdjusted hardness12 gpgPeak resin loading2.5 gpm/ft³Softened outletUsable capacity remaining80 %ExhaustedRegenerated
Capacity remaining after the entered time in service.
Adjusted hardness
12 gpg
Daily hardness load
144,000 grains/d
Usable capacity
360,000 grains
Rated capacity per resin volume
20,000 grains/ft³
Salt per 30 days
1,440 lb/30 d
Resin for target interval
16 ft³
Usable capacity remaining
80 %

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. The 6 lb/ft³ planning curve assigns 20,000 grains/ft³. After the reserve, 20 ft³ provides 360,000 grains.
  2. At 12 gpg the bed treats 30,000 gal, or 2.5 days. The cycle uses 120 lb salt.

More worked examples

Equations & conventions

Compensated hardness
H = Hᵣₐw + kꜰₑ[Fe] + kₘₙ[Mn]

US hardness uses gpg, where 1 gpg is approximately 17.118 mg/L as CaCO₃. The editable default Fe/Mn allowances are planning inputs. Use the resin supplier’s corrections.

Usable capacity
C = Vᵣₑₛᵢₙ × Cᵣₐₜₑ𝒹 × (1 − reserve)

The planning curve uses 20,000, 27,000 and 30,000 grains/ft³ at 6, 10 and 15 lb salt/ft³. Capacity and leakage vary by resin and regeneration conditions.

Run length and resin volume
Vcycle = C / H, t = Vcycle / Qday

Daily hardness load is Qday × H. For resin at a target interval, multiply that load by the days and divide by usable capacity per unit resin.

Salt and service loading
Salt/regeneration = Vᵣₑₛᵢₙ × salt rate

Divide salt per regeneration by the run length and multiply by 30 for average 30-day consumption. Peak service flow divided by resin volume gives gpm/ft³ or bed volumes per hour.

Planning basis

The 1–5 gpm/ft³ service range is a C100 bulletin reference. Capacity can change with water chemistry, bed depth, flow and resin condition. Combined Fe/Mn above 0.5 mg/L calls for pretreatment and resin review under conventional waterworks guidance.

Questions

How much usable capacity is left after half a day in this case?

Half a day uses 0.5 ÷ 2.5 = 20% of usable capacity, leaving 80%.