Hyperscale infrastructure case

Cooling pump equal replacement costs

A cooling pump shows wear-out, but procurement and labor make the planned change cost the same as a failure replacement.

Inputs

h
cost units
cost units
ReviewRun-to-failure optimal (preventive replacement counterproductive)
Optimal age
∞h
Optimal rate
0.104558/h
Run-to-fail
0.104558/h
Cost savings
0%

Age replacement cost rate

Preventive replacement cost rate versus ageRenewal cost rate · per h00.3760.75240603.4e46.3e49.3e4Replacement age (h)Age policyRun to failure

The horizontal reference is the long-run run-to-failure rate. The marker identifies the finite optimum when the model has one.

Download

Detailed results

Weibull mean life
25,823.08 h
Planned replacement cost
2,700 cost units
Failure replacement cost
2,700 cost units

At equal costs, an earlier replacement reduces expected time in service while leaving the cost per renewal the same.

Formula trace

  1. E[cycle time] = ∫₀ᵀ exp[−(u/η)ᵝ] duIntegrate the reliability curve by composite Gauss–Legendre quadrature.
  2. C(T) = [Cₚ R(T) + C𝒻 F(T)] / E[cycle time]Use the run-to-failure limit for the reported policy.
  3. Run-to-failure cost rate = C𝒻 / MTTFThe failure-only policy costs 0.1045576 per hour.
  4. Savings = 1 − C(T*) / C(∞)The modeled saving is 0%.

Model assumptions

Replacement restores the item to as-new condition. Costs must share the same currency and include the relevant labor and outage cost. The model assumes independent lifetimes and no replacement delay.

Method and sources

Related examples