Industrial automation case

Robot harness preventive replacement

Repeated flexing gives a harness a Weibull shape of 3.8. Compare a scheduled harness change with the cost of a line stop.

Inputs

h
cost units
cost units
PassPlanned replacement reduces the cost rate
Optimal age
4,223.27h
Optimal rate
0.122827/h
Run-to-fail
0.344231/h
Cost savings
64.3184%

Age replacement cost rate

Preventive replacement cost rate versus ageRenewal cost rate · per h00.1940.389126083401.5e42.3e4Replacement age (h)Age policyRun to failure

The horizontal reference is the long-run run-to-failure rate. The marker identifies the finite optimum when the model has one.

Download

Detailed results

Weibull mean life
8,134.084 h
Planned replacement cost
380 cost units
Failure replacement cost
2,800 cost units

Calendar interval depends on how operating hours accumulate. Use the basis selector to express the same optimum in days or years of operation.

Formula trace

  1. E[cycle time] = ∫₀ᵀ exp[−(u/η)ᵝ] duIntegrate the reliability curve by composite Gauss–Legendre quadrature.
  2. C(T) = [Cₚ R(T) + C𝒻 F(T)] / E[cycle time]The minimizing age is 4,223.267 h.
  3. Run-to-failure cost rate = C𝒻 / MTTFThe failure-only policy costs 0.3442305 per hour.
  4. Savings = 1 − C(T*) / C(∞)The modeled saving is 64.31843234%.

Model assumptions

Replacement restores the item to as-new condition. Costs must share the same currency and include the relevant labor and outage cost. The model assumes independent lifetimes and no replacement delay.

Method and sources