ASME IX · EN 1011-1
SMAW field repair on an arc-energy basis
A field repair record lists minimum and maximum electrical energy, with travel measured in inches per minute.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsArc energy window · 20.32 kJ/in to 38.1 kJ/in on an electrical basis.
Result details
| Net heat input | 34.56 kJ/in |
|---|---|
| Electrical arc energy | 43.2 kJ/in |
| Thermal efficiency | 80 % |
| Arc power | 3.24 kW |
| Energy used for check | 43.2 kJ/in |
| Solid steel wire feed (mass) | — |
| Estimated net wire deposition | — |
| Entered window minimum | 20.32 kJ/in |
| Entered window maximum | 38.1 kJ/in |
| Distance to nearest bound | -5.1 kJ/in |
Worked example
Starting inputs
- WPS energy basis
- Arc energy (V × I)
- Welding process
- SMAW
- Arc voltage
- 24 V
- Arc current
- 135 A
- Travel speed
- 4.5 in/min
- Minimum energy
- 20.32 kJ/in
- Maximum energy
- 38.1 kJ/in
Baseline results
- Net heat input
- 34.56 kJ/in
- Electrical arc energy
- 43.2 kJ/in
- Thermal efficiency
- 80 %
- Arc power
- 3.24 kW
With 3.24 kW at 4.5 in/min travel, electrical arc energy is 43.2 kJ/in. The 80 % process factor gives 34.56 kJ/in of net heat input.
Try it. The electrical result is checked directly. The separate net heat row still shows the 0.80 planning adjustment.
Calculation method
Arc energy = 60P / v · Net heat input = η × 60P / v
Use P in kW and travel v in mm/min for kJ/mm. Electrical power comes from V × I / 1,000 or from measured mean instantaneous V × I during the run. For waveform-controlled welding, use the acquisition method required by the governing procedure.
Planning thermal factors are SAW 1.00, GMAW/FCAW/SMAW 0.80 and GTAW 0.60. Use WPS bounds expressed on the same basis as the selected result. Wire figures use a solid-steel equivalent of 7,850 kg/m³. Tubular wire needs measured linear mass for a production estimate.