SMAW field repair on an arc-energy basis

A field repair record lists minimum and maximum electrical energy, with travel measured in inches per minute.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Arc parameters
V
A
in/min
WPS limits
kJ/in
kJ/in

Live weld sheet

Updated from inputs
Arc and weld poolNet heat input 34.56 kJ/in. Electrical arc energy 43.2 kJ/in. Thermal efficiency 80 %. Arc power 3.24 kW NET HEAT34.56kJ/inARC ENERGY43.2kJ/inTHERMAL EFF.80%ARC POWER3.24kW ARC AND WELD POOL Travel 4.5 in/minArc 43.2 kJ/inSMAW ARC ENERGY WINDOWFAIL
Outside screen

Arc energy window · 20.32 kJ/in to 38.1 kJ/in on an electrical basis.

Result details

Net heat input34.56 kJ/in
Electrical arc energy43.2 kJ/in
Thermal efficiency80 %
Arc power3.24 kW
Energy used for check43.2 kJ/in
Solid steel wire feed (mass)—
Estimated net wire deposition—
Entered window minimum20.32 kJ/in
Entered window maximum38.1 kJ/in
Distance to nearest bound-5.1 kJ/in

Worked example

Starting inputs

WPS energy basis
Arc energy (V × I)
Welding process
SMAW
Arc voltage
24 V
Arc current
135 A
Travel speed
4.5 in/min
Minimum energy
20.32 kJ/in
Maximum energy
38.1 kJ/in

Baseline results

Net heat input
34.56 kJ/in
Electrical arc energy
43.2 kJ/in
Thermal efficiency
80 %
Arc power
3.24 kW

With 3.24 kW at 4.5 in/min travel, electrical arc energy is 43.2 kJ/in. The 80 % process factor gives 34.56 kJ/in of net heat input.

Try it. The electrical result is checked directly. The separate net heat row still shows the 0.80 planning adjustment.

Calculation method

Arc energy = 60P / v · Net heat input = η × 60P / v

Use P in kW and travel v in mm/min for kJ/mm. Electrical power comes from V × I / 1,000 or from measured mean instantaneous V × I during the run. For waveform-controlled welding, use the acquisition method required by the governing procedure.

Planning thermal factors are SAW 1.00, GMAW/FCAW/SMAW 0.80 and GTAW 0.60. Use WPS bounds expressed on the same basis as the selected result. Wire figures use a solid-steel equivalent of 7,850 kg/m³. Tubular wire needs measured linear mass for a production estimate.