API 1104 · ASME B31.3
NPS 12 compound bevel on heavy wall
A 70° primary bevel transitions to an 18° outer included angle on the Schedule 80 joint.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCycle time budget · 62.52 min planned vs 70 min budget.
Result details
| Deposited filler per joint | 3.084 lb |
|---|---|
| Estimated passes | 9 |
| Joint arc time | 50.52 min |
| Total joint cycle | 62.52 min |
| Effective wall | 0.688 in |
| Pipe outside diameter | 12.75 in |
| Pipe bore | 11.374 in |
| Groove centroid circumference | 38.31 in |
| Outside circumference | 40.06 in |
| Root circumference | 35.73 in |
| Groove mouth width | 0.54 in |
| Uncapped groove section | 0.262 in² |
| Groove and cap volume | 10.87 in³ |
| Filler purchase per joint | 3.352 lb |
| Root passes | 1 |
| Hot passes | 1 |
| Fill passes | 5 |
| Cap beads | 2 |
| Cycle time margin | 7.48 min |
Worked example
Starting inputs
- Nominal pipe size
- NPS 12
- Wall source
- Schedule 80
- Bevel profile
- Compound V
- Primary included angle
- 70 °
- Outer included angle
- 18 °
- Depth to bevel break
- 0.2 in
- Root opening
- 0.125 in
Baseline results
- Deposited filler per joint
- 3.084 lb
- Estimated passes
- 9
- Joint arc time
- 50.52 min
- Total joint cycle
- 62.52 min
The 0.262 in² groove runs around a 38.31 in centroid circumference before cap allowance. The sequence adds 1 root, 1 hot, 5 fill and 2 cap passes over 50.52 min of arc time.
Try it. Switch to a single V while holding wall and primary angle fixed. The outer groove opens farther and the weld volume increases.
Calculation method
V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed
The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.
Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.
Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.